Progression of Construction through the foundation of Phase 3
Progression of Construction through the foundation of Phase 3
Phase 2 Classrooms - Finished
(Tour with French Commentary)
Phase 2 - Finished Gathering Space
(Tour with French Commentary)
Phase 1 Administration and Library (construction began on 18 May, 2020):
Phase 2 Classroom Wing (construction began on 25 January 2021):
Fourteen classrooms of size 6 by 8 m equipped with 45 chairs with backrests and twenty‐three desks for students; a desk table with a teacher's chair, a shelf and a blackboard.
Two unequipped workshop rooms of size 12 by 16 meters (one for the electromechanical workshop on the ground floor and another for the computer workshop upstairs).
A retaining wall in front of and along the entire building.
A rainwater and wastewater management channel