St Francis de Sales School - Beckley, WV | Senior Project Manager: John Reynolds
CentiMark addressed all concerns the facility management had, from the warranty to the completion time. The new roof was installed during summer break when children were not present and the customer was delighted with the results. Read more in project description below!
For more information about this project, contact John Reynolds at (800) 720-4129 or John.Reynolds@CentiMark.com
Four Catholic Schools - Multiple Locations in GA | Senior Project Manager: Taylor Gill
CentiMark develops a portfolio that identifies and enhances cost savings through regional customized agreements negotiated on a local basis to obtain realistic value added solutions. CentiMark can provide preferred pricing with the realization of cost savings. We accomplish this through standardization of roofing specifications, quality materials; strict safety policies; enhanced technology; preventative maintenance & dedicated customer service.
CentiMark was approached by Catholic Construction Services to inspect each of these locations. Each property was in need of roof replacement due to the current age, active leaks, and safety issues. CentiMark performed thermal scans of each roof section to determine the amount of wet insulation and locations of these areas. Our goal was to have zero (0) change orders and to know upfront how much the project will be. CCS also let us know that there would be a time frame that would need to be met for starting & completing these roofs. CentiMark was able to allocate seven (7) crews to complete all four (4) locations in less than two months which was well before the deadline. We were able to provide a discount price since the project required work on multiple roofs and could be bundled to save the locations money. CentiMark also provided a donation to each of the four (4) locations upon the completion of the project.
For more information about this project, contact Taylor Gill at (770) 688-2460 or Taylor.Gill@CentiMark.com
Gateway Fellowship SPC, Gilbert, AZ | Senior Project Manager: Lloyd Weimer
This was a unique foam and coating project we completed this year in Gilbert, AZ. The absence of a roof coating in many areas had exposed the SPF below to the sun's harmful uv rays. This roof was in desperate need of some CentiHelp! We essentially had to scarify (grind away) a layer of old foam, install a 1" layer of new SPF spray foam, and apply 3.5 gallons of acrylic coatings. Our operations team did a great job with the installation!
“This year, we hired your company to do extensive roof repairs/replacement. We would be more than happy to refer CentiMark to anyone looking for someone to do roofing on their facility. It was a wonderful experience and we are happy with the outcome. Again, thank you so much!” - Gateway Fellowship Church
For more information about this project, contact Lloyd Weimer at (480) 351-1229 or LLoyd.Weimer@CentiMark.com
Jude Catholic Church, Lakewood, CO | Gutter Repair & Snow Stops
Service Representative: Brent Wilhelmi
The west edge of the roof and the sheet metal flashing came loose in the high winds. The crew made an emergency call to do a temporary repair using plates and fasteners to hold it in place until the permanent repairs were complete. When we returned, we removed the existing metal and membrane flashing. We attached the field membrane along the edge with pates and fasteners to keep the field of the roof from lifting and pulling the flashing loose. We installed new flashing to seal the plates and the top of the parapet wall. To limit the chance of this happening again with the high winds that we get in Colorado, we installed an ES1 perimeter edge metal detail. Also installed on the roof were snow clips to aid with the heavy snow the area often gets. The roof surface that we worked on has a large slope causing snow and ice to come loose all at one time. This was causing the gutters to be damaged and was a liability to the parishioners walking below the roof. There had been several attempts by other roofing companies to solve the sliding issue that had not worked. We designed a pattern to install snow gems on the lower section to hold the snow and ice in place while it melted. The snow gems were installed using a special adhesive to make sure that they are adhered to the PVC membrane properly.
For more information about this project, contact Brent Wilhelmi at (303) 583-3939 or Brent.Wilhelmi@CentiMark.com
Detroit Catholic Central High School / AP 383066
27225 Wixom Rd. Novi, MI 48374
Facility contact: Kevin Kotzian
Phone # 248-596-3823
SPM: Jeffrey Mollard
Charleston Catholic High School / AP 387931
1033 Virginia St E., Charleston, WV 25301
Facility contact: John Villers
Phone # 304-342-8415
SPM: John Reynolds
St Raphael The Archangel School / AP 384517
6000 Jamieson Ave., Saint Louis, MO 63109
Facility contact: Sonny Williams
Phone # 636-475-1185
SPM: Ryan Kipp
Cathedral Basilica Immaculate Conception/ AP 420380
1503 N. Logan Street, Denver, CO 80203
Facility contact: Antonio Cabrera
Phone # 303-830-7010
SPM: Jeff Bess
St Vincent De Paul / 426633
1730 Golden Mile Hwy, Monroeville, PA 15146
Facility Contact: Emma Yingling
Phone # 540-532-5670
SPM: Nicholas Lamolinare
Cornerstone Baptist Temple / AP 58944
1707 Ohmer Ave, Dayton, OH 45410
Facility contact: Craig Loudin
Phone # 937-253-6151
SPM: Brian Fox
Ames First United Methodist Church / AP 415853
516 Kellogg Ave., Ames, IA 50010
Facility contact: James Minot
Phone # 515-232-2750
SSR: Dennis Bjerke
Denver Jewish Day School / AP 402692
2450 S Wabash St., Denver, CO 80231
Facility contact: Avi Halzel
Phone # 303-345-1140
SPM: Joseph Smartz
Menlo Church / AP 414062
950 Santa Cruz Ave., Menlo Park, CA 94025 Facility contact: Peter Sherman
Phone # 650-323-8606
SPM: Nolan Freitag
Spirit of Grace Church / 419121
7400 SW Scholls Ferry Road, Beaverton, OR 97008 Facility contact: Dick Hartung
Phone # 503-348-3000
SPM: Casey Stone