BTE is a System Integrator that has specialty in design
installment of process control and improvement of process control including,
AC/DC Drive System for Emerson and Yaskawa PLC for Siemens and Mitsubishi HMI/SCADA for Siemens and National Instrument.
IoT Monitoring System features:
Real-time Monitoring: Tracks electrical systems and machinery status via the internet.
Connectivity: Supports sensors, and meters.
Cloud Integration: Transmits data to the Cloud for dashboard visualization and alerts.
Benefits: Helps reduce downtime and increases preventive maintenance efficiency."
BTE is founded in 1996 and wholly owned by Thai.
BTE is one of leading company to provides industrial services as system integrtor. Our services are designing, panel fabricating and installing low voltage switchboard, motor control, industrial automation.
Our mission is to build new system and improve existing system to meet requirements of industrial manufacturer.
Chum Saeng Subdistrict, Wang Chan District, Rayong Province
WASTEWATER TREATMENT PLANT AND LABORATORY CENTER
LADKRABANG INDUSTRIAL ESTATE
Executives and staff from Irrigation Office 13 visited the production of motor control panels for the electric pumping station at Water Delivery and Drainage Canal 8 Right–Song Phi Nong, under the Bang Len Water Delivery and Maintenance Project.
Customer: Nestle (Thai) Co.,Ltd.
We are proud to be a part of the MRT Yellow Line Project, BTE supplied Type Tested Panels (MDB/EMDB) and AMCC Panels to the Depot,
23 Stations, and Park & Ride for the Yellow Line Monorail, which spans a distance of 30.4 km, running from Lat Phrao to Samrong in the East of Bangkok.
Currently, the project is offering free rides to the public from Hua Mark to Samrong starting on the 3rd of June 2023
We are proud to be a part of the MRT Pink Line Project. BTE supplied Type Tested Panels (MDB/EMDB) and AMCC Panels to the 30 Stations,
Depot, and Park & Ride for the Pink Line Monorail, which spans a distance of 34.5 km, running from Kai Rai,
Nonthaburi to Min Buri district in the East of Bangkok Currently, it ‘s under trail run and test before the line opens for public trails in November 2023.
BTE COMPANY LIMITED
21/2 Moo 12 Lumlukka Sub district Lumlukka District Pathumtani 12150
Email: info@bte.co.th
Support Center:
085-363-5114
After-Sales Service:
081-583-5854
Accounting Department:
081-843-2826
Purchasing Department:
081-559-2452
Sales Department:
087-565-1818
Engineering Department:
085-842-6598
HR Department: 080-443-7722