Note: Class cannot start at Wooden Boat School until October 24th
September
19th Introduce myself and Nick Carter, talk about the schedule for the year and expected behavior. Field trip and tour of Wooden Boat Publication and Wooden Boat School to see the classroom they will be using while the school is still in session.
26th Field trip to Brooklin Boatyard, talk about the history of boats along this section of coast including how the boatyard was originally a sardine packing factory that employed as many as 200 people at the height of the industry and the shipwrights that it took to support that industry.
October
3rd Class at Brooklin School. Talk through the process of building a skiff, steps involved, and build paper models of the boats to scale using the building plans provided. Each student will leave class with a 3d scale model of the skiff of their own.
10th Field trip to Center Harbor Show students skiffs we are going to build in the water, from the town landing/ beach give a rowing demonstration and give kids a chance to get in boats and row around the inner harbor. USCG certified life jackets will be provided.
24th First class at Wooden Boat School. Introduction of shop space and where tools are kept. Talk about different materials and hand tools we are going to use over the course of the year. Basic hand tools and their use- hand planes, screwdrivers, and cordless drills. Layout tools such as straight edge, squares, bevel gauges. How to safely and accurately handle hand tools.
31st Using scale drawings, loft (draw)boat full size/ start making molds
November
7th Finish building mold discuss how other 3D objects are lofted with handouts
14th Start building saw horses and building jig
28th Discussion on different types of wood, there uses, and boat terminology with handouts
December
5TH Set up molds on strong back and start to fair setup
12th Glue up transom and start wooden spoons for x-mas gifts
19th Finish wooden spoons
January
2nd Cut out transom, mount transom and stem
9th Start planking starting with chine plank
16th Topside planking
30th Topside planking
February
6th Topside planking
13th Install frames
27th Finish installing frames, fair chines
March
6th Start planking bottom
13th Plank bottom
20th Fair planking, install outer stem
27th Caulk seams with cotton
April
3rd Fill seams and screw heads
10th Last class at Wooden Boat School, remove hull from building jig
24th Fit and install rub rails
May
1st Fit and install seat risers
8th Fit and install seats
15th Fit and install oar locks
22nd Sand/ oil/ paint
29th Launch Boat at Brooklin town landing Center Harbor
June
5th On the water Center Harbor/ Chatto Island
12th On the water Center Harbor/ Chatto Island