History of Facilities Work

History of Facilities Work

Over the years, the Facilities Department has done work on the facilities, which have been funded by local budget, capital improvement funds through the Town of Billerica, and grants. The list below reflects some of the work that has been completed. Billerica Public Schools prioritizes the maintenance and improvements of our schools in order to ensure optimal learning environments for our students. 

FY23 

Work Completed and Location

Sprinkler work

Ditson

Cement Replacement

Ditson

RTU, Culvert, and Portable Stair Replacement

Dutile

Paving / Line Striping

Dutile, Ditson

Paving

Hajjar

Boiler Replacement

Hallenborg Ice Rink

Upgrade and Improve Hot Water System

Kennedy

LED Upgrade

Locke, Parker, Ditson

Fencing, Paving and Cement Grinding (Playground Upgrades) 

Parker

Repair of Detectable Warning Pads

Parker

Door Replacement

Marshall

FY22 

Work Completed and Location

Floor Asbestos Abatement and Retiling

Kennedy, Marshall, Dutile, Locke

Light Fixture Upgrades / Replacement

Kennedy, Marshall

Entrance Walkway Paving

Locke

Security Camera Upgrade

Parker

Bus Loading Zone Concrete Installation

Hajjar

Gym Floor Refinishing

Marshall

Paving Multiple Areas

Ditson

Proximity Card Access Points Installation

Ditson

Window Repair and Replacement

Marshall

Water Bubbler Replacement

Districtwide

Plexi-Glass Installation

Districtwide

Gym Floor Covering Purchase

Districtwide

Exhaust Fan and Ventilator Replacement

Districtwide

LED Light Installation

Dutile, Hajjar

Boiler Plant Replacement

Kennedy

Culvert Replacement

Dutile

Boiler Project

Hallenborg

Playground Upgrades / Repairs

Districtwide

Sprinkler Repair / Upgrade

Ditson

HVAC Controls Upgrade

Ditson

FY22 

Work Completed and Location

Floor Asbestos Abatement and Retiling

Kennedy, Marshall, Dutile, Locke

Light Fixture Upgrades / Replacement

Kennedy, Marshall

Entrance Walkway Paving

Locke

Security Camera Upgrade

Parker

Bus Loading Zone Concrete Installation

Hajjar

Gym Floor Refinishing

Marshall

Paving Multiple Areas

Ditson

Proximity Card Access Points Installation

Ditson

Window Repair and Replacement

Marshall

Water Bubbler Replacement

Districtwide

Plexi-Glass Installation

Districtwide

Gym Floor Covering Purchase

Districtwide

Exhaust Fan and Ventilator Replacement

Districtwide

LED Light Installation

Dutile, Hajjar

Boiler Plant Replacement

Kennedy

Culvert Replacement

Dutile

Boiler Project

Hallenborg

Playground Upgrades / Repairs

Districtwide

Sprinkler Repair / Upgrade

Ditson

HVAC Controls Upgrade

Ditson

FY21

Work Completed and Location

Ventilation Upgrades (In response to COVID)

Districtwide

(Throughout 2020-2021 and 2021-2022, facilities work focused on upgrading ventilation systems in response to COVID.

FY20

Work Completed and Location

Security / Lock Project

Districtwide

Ceiling Repair / Replacement

Marshall, Dutile

Bus Loop and Student Drop-Off Lane Paving

Dutile

Resin Overlay and Painting of Track

Marshall

Roof Repair

Dutile

LED Light Installation

Dutile, Kennedy, Hajjar

Modular Repair

Dutile

Asbestos Abatement and Retiling of Flooring

Locke

Asbestos Abatement and Concrete Flooring Installation in Woodshop

Marshall

Entry Sidewalk Repair

Dutile

FY19

Work Completed and Location

Flooring Material and Install

Marshall

Locker Installation

Marshall

Entry Sign

Locke

Bridge Paving and Speed Bump Installation

Ditson

Student Drop-off Walkway Paving

Locke

Courtyard Outdoor Learning Space Upgrades

Kennedy

Seat Reupholstering and armrest Replacement in Auditorium

Locke

Concrete Ramp Installation at Entry

Kennedy

Fire Exit Repair

Dutile

Playground Structure Installation

Hajjar

Asbestos Abatement on Cafeteria Floors

Hajjar, Marshall

Redesign of BEAM Space (Relocation)

BEAM @ 25 Linnell Circle

Roof Repair

Dutile

Gym Upgrades

Hajjar

Repurposing of Storage Room (Relocation of Payroll)

School Department @ Town Hall

FY18

Work Completed and Location

LED Light Installation

Kennedy

Asbestos Abatement in Cafe

Kennedy, Locke

Playground Structure Installation

Dutile

Repaving Bus Loop

Locke

Asbestos Abatement

Marshall

Cafeteria Table Replacement

Multi School

Ceiling Panel Coating

Multi School

FY17

Work Completed and Location

Repair of Auditorium Seating

Marshall

Asbestos Abatement and Flooring Replacement

Kennedy, Dutile, Marshall

Cafe and Fire Exit Door Repair/Replacement

Marshall

Teacher Lot and Studenet Drop-Off Paving

Kennedy

Freezer Installation

Dutile

School Zone Lighting

Marshall

TV Studio Upgrades

Marshall

Bridget Sidewalk and Handrail Replacement

Ditson

LED Light Installation

Hallenborg

Asbestos Pipe Replacement

Marshall

Ceiling and Lighting Replacement

Dutile, Kennedy

Cafeteria Wall Replacement

Dutile

Front Sidewalk and Path Replacement

Marshall

Field Upgrades

Marshall

Window Panel and Door Repair and Paint

Locke

Parking Lot Replacement

Hajjar

Carpeting

Marshall, Locke

FY16

Work Completed and Location

Teacher Lot and Entrance Abutting Bridge Paving and Bridge Footing Repair

Ditson

Sidewalk and Handicap Ramps Paving

Dutile

Deteriorated Foyer Flagstones Replaced with Concrete

Hajjar

Roofing Project

Hajjar

Concrete Sidewalk Repair

Kennedy

Library and TV Studio Remodeled

BMHS

Student Parkng Lot Paving

BMHS

Side Entrance Door Repair

Marshall

Garage Door and Side Entrance Door Closers and Monitors

Marshall

Replacement Lockers

Marshall

Bathroom Partition Replacement

Districtwide

Walkway Repair

Marshall

Theater Auditorium Control Booth Upgrades

Marshall

FY15

Work Completed and Location

Water Bubble Replacements at Marshall and BMHS

BMHS

Satellite Cafey A/V Electrical Portion

Preventative Maintenance on Food Service Equipment

Additional Snow Removal from Roof, Play Areas, Driveway, and Lots

Replaced Steam Trap

BMHS

Bathroom Partition Replacement

Marshall

Heating System Pipe Replacement

Marshall

Condensing Unit for Walk-In Freezer

Dutile

Districtwide Walk-In Freezer Project

Marshall

New System for Electric Heating Wires on Roof

Hallenborg

Asbestor Abatement

Districtwide

New Concrete for Outside Entrance

Hajjar

Walk Behind or Ride-on Scrubber

Hallenborg, BMHS, Dutile, Hajjar, Marshall

Bridget Hot Topping

Hajjar

Parking Lot Hot Topping

Dutile