History of Facilities Work
History of Facilities Work
Over the years, the Facilities Department has done work on the facilities, which have been funded by local budget, capital improvement funds through the Town of Billerica, and grants. The list below reflects some of the work that has been completed. Billerica Public Schools prioritizes the maintenance and improvements of our schools in order to ensure optimal learning environments for our students.
FY23
Work Completed and Location
Sprinkler work
Ditson
Cement Replacement
Ditson
RTU, Culvert, and Portable Stair Replacement
Dutile
Paving / Line Striping
Dutile, Ditson
Paving
Hajjar
Boiler Replacement
Hallenborg Ice Rink
Upgrade and Improve Hot Water System
Kennedy
LED Upgrade
Locke, Parker, Ditson
Fencing, Paving and Cement Grinding (Playground Upgrades)
Parker
Repair of Detectable Warning Pads
Parker
Door Replacement
Marshall
FY22
Work Completed and Location
Floor Asbestos Abatement and Retiling
Kennedy, Marshall, Dutile, Locke
Light Fixture Upgrades / Replacement
Kennedy, Marshall
Entrance Walkway Paving
Locke
Security Camera Upgrade
Parker
Bus Loading Zone Concrete Installation
Hajjar
Gym Floor Refinishing
Marshall
Paving Multiple Areas
Ditson
Proximity Card Access Points Installation
Ditson
Window Repair and Replacement
Marshall
Water Bubbler Replacement
Districtwide
Plexi-Glass Installation
Districtwide
Gym Floor Covering Purchase
Districtwide
Exhaust Fan and Ventilator Replacement
Districtwide
LED Light Installation
Dutile, Hajjar
Boiler Plant Replacement
Kennedy
Culvert Replacement
Dutile
Boiler Project
Hallenborg
Playground Upgrades / Repairs
Districtwide
Sprinkler Repair / Upgrade
Ditson
HVAC Controls Upgrade
Ditson
FY22
Work Completed and Location
Floor Asbestos Abatement and Retiling
Kennedy, Marshall, Dutile, Locke
Light Fixture Upgrades / Replacement
Kennedy, Marshall
Entrance Walkway Paving
Locke
Security Camera Upgrade
Parker
Bus Loading Zone Concrete Installation
Hajjar
Gym Floor Refinishing
Marshall
Paving Multiple Areas
Ditson
Proximity Card Access Points Installation
Ditson
Window Repair and Replacement
Marshall
Water Bubbler Replacement
Districtwide
Plexi-Glass Installation
Districtwide
Gym Floor Covering Purchase
Districtwide
Exhaust Fan and Ventilator Replacement
Districtwide
LED Light Installation
Dutile, Hajjar
Boiler Plant Replacement
Kennedy
Culvert Replacement
Dutile
Boiler Project
Hallenborg
Playground Upgrades / Repairs
Districtwide
Sprinkler Repair / Upgrade
Ditson
HVAC Controls Upgrade
Ditson
FY21
Work Completed and Location
Ventilation Upgrades (In response to COVID)
Districtwide
(Throughout 2020-2021 and 2021-2022, facilities work focused on upgrading ventilation systems in response to COVID.
FY20
Work Completed and Location
Security / Lock Project
Districtwide
Ceiling Repair / Replacement
Marshall, Dutile
Bus Loop and Student Drop-Off Lane Paving
Dutile
Resin Overlay and Painting of Track
Marshall
Roof Repair
Dutile
LED Light Installation
Dutile, Kennedy, Hajjar
Modular Repair
Dutile
Asbestos Abatement and Retiling of Flooring
Locke
Asbestos Abatement and Concrete Flooring Installation in Woodshop
Marshall
Entry Sidewalk Repair
Dutile
FY19
Work Completed and Location
Flooring Material and Install
Marshall
Locker Installation
Marshall
Entry Sign
Locke
Bridge Paving and Speed Bump Installation
Ditson
Student Drop-off Walkway Paving
Locke
Courtyard Outdoor Learning Space Upgrades
Kennedy
Seat Reupholstering and armrest Replacement in Auditorium
Locke
Concrete Ramp Installation at Entry
Kennedy
Fire Exit Repair
Dutile
Playground Structure Installation
Hajjar
Asbestos Abatement on Cafeteria Floors
Hajjar, Marshall
Redesign of BEAM Space (Relocation)
BEAM @ 25 Linnell Circle
Roof Repair
Dutile
Gym Upgrades
Hajjar
Repurposing of Storage Room (Relocation of Payroll)
School Department @ Town Hall
FY18
Work Completed and Location
LED Light Installation
Kennedy
Asbestos Abatement in Cafe
Kennedy, Locke
Playground Structure Installation
Dutile
Repaving Bus Loop
Locke
Asbestos Abatement
Marshall
Cafeteria Table Replacement
Multi School
Ceiling Panel Coating
Multi School
FY17
Work Completed and Location
Repair of Auditorium Seating
Marshall
Asbestos Abatement and Flooring Replacement
Kennedy, Dutile, Marshall
Cafe and Fire Exit Door Repair/Replacement
Marshall
Teacher Lot and Studenet Drop-Off Paving
Kennedy
Freezer Installation
Dutile
School Zone Lighting
Marshall
TV Studio Upgrades
Marshall
Bridget Sidewalk and Handrail Replacement
Ditson
LED Light Installation
Hallenborg
Asbestos Pipe Replacement
Marshall
Ceiling and Lighting Replacement
Dutile, Kennedy
Cafeteria Wall Replacement
Dutile
Front Sidewalk and Path Replacement
Marshall
Field Upgrades
Marshall
Window Panel and Door Repair and Paint
Locke
Parking Lot Replacement
Hajjar
Carpeting
Marshall, Locke
FY16
Work Completed and Location
Teacher Lot and Entrance Abutting Bridge Paving and Bridge Footing Repair
Ditson
Sidewalk and Handicap Ramps Paving
Dutile
Deteriorated Foyer Flagstones Replaced with Concrete
Hajjar
Roofing Project
Hajjar
Concrete Sidewalk Repair
Kennedy
Library and TV Studio Remodeled
BMHS
Student Parkng Lot Paving
BMHS
Side Entrance Door Repair
Marshall
Garage Door and Side Entrance Door Closers and Monitors
Marshall
Replacement Lockers
Marshall
Bathroom Partition Replacement
Districtwide
Walkway Repair
Marshall
Theater Auditorium Control Booth Upgrades
Marshall
FY15
Work Completed and Location
Water Bubble Replacements at Marshall and BMHS
BMHS
Satellite Cafey A/V Electrical Portion
Preventative Maintenance on Food Service Equipment
Additional Snow Removal from Roof, Play Areas, Driveway, and Lots
Replaced Steam Trap
BMHS
Bathroom Partition Replacement
Marshall
Heating System Pipe Replacement
Marshall
Condensing Unit for Walk-In Freezer
Dutile
Districtwide Walk-In Freezer Project
Marshall
New System for Electric Heating Wires on Roof
Hallenborg
Asbestor Abatement
Districtwide
New Concrete for Outside Entrance
Hajjar
Walk Behind or Ride-on Scrubber
Hallenborg, BMHS, Dutile, Hajjar, Marshall
Bridget Hot Topping
Hajjar
Parking Lot Hot Topping
Dutile