Updates

August 14 - Inside walls are up for the Music/Tech Ed wing, high school hall tile replacement, waxing hallways, adding lockers to upper boys, girls, coaches locker rooms, upstair bathroom finished in new addition, gym floor done added bleachers, new middle school lockers, old cabinets taken out of old home economics room.

July 23 - Steel Framing, concrete pouring for music rooms, finishing and sealing building off from where old building was torn down, tile being laid, painting in middle school hall, bathrooms and classrooms touch ups.

July 9 - Steel frame for Tech Ed and Music rooms up, wood floor in Gym finished next up lines added, new lighting in Middle School Hall, cabinets removed out of old Home Economics (Ms. Cox Room).

July 2 - Eagle logo and name put on front of building, old shed torn down, seating area started in commons area, new middle school locker ready to be installed, wood prep for gym flooring, concession stand final touches, weight room floor installed, Mr. Wood's classroom done.

June 14 - New Gym hoops and scoreboard installed, bricks laid in hallway from old part of building that run in front of kitchen, wall being build for new Tech Ed and Music

June 7 - More demolition on old building, wall taken out to make room for new Middle School lockers, wall removed between room to make MS new Science Room.

June 3 - Demolition in the LMC, back part of Art room and Mrs. Kavanuugh's office, wall being build in LMC for connecting hallway. Some photo's video of demolition of old building from May 31.

May 28 - Demolition continues outside and inside the old part of the LMC, commons area finished, new library looking great. Last day of school students watch a movie in the common area by the classrooms.

May 20 - Demolition part 2, lunch is served, first layer of parking lot.

May 13 - Demolition started today on the old part of the building. New fencing going up around the building.

May 10 - We are doing the finishing of moving today. Monday May 13 everyone will use the new entrance.

April 24, 2019 - Cleaning crew in to clean some areas, final touches on windows in commons areas, wall torn out between old Tech Ed Shop and Multi Purpose Gym, carpet and tiles in classrooms, projectors being installed, whiteboard installed, furniture to arrive later in the week.

March 22, 2019 - Work on Skywalk from new wing to High School wing, Wall for Locker rooms, Painting in classrooms, white boards installed, tile in kitchen and new hallway. Drone video

March 1, 2019 - Drywall and painting classrooms and new office area. Opened area for Cafeteria, Walk in Freezer and Refrigerator, Kitchen Cooking Hoods

January 24, 2018 - View from inside the new Elementary Wing. These photo's taken Jan. 18

January 18, 2019 - Permeant door and wall to electrical room, fluorescent light fixture removed, brick laying in new hallway in new lunchroom area, piping going in for new locker rooms, room gutted for new IT wiring closest.

January 14, 2019 - Finishing the roof of the new addition, The 1st and 2nd floors in the elementary area and new locker room area (old shop) being worked on. Kitchen area, new teachers lounge (backside of boy's locker room) and hallway.

January 3, 2019 - Work done in the Tech Ed room and shop area to open up for new gym. Roof and floor put into the new addition. New wall build between middle school hall and lunch room door. Electrical and heating piping went in the halls.

December 12, 2018 - Tech Ed classroom and equipment moved to bus garage. Window Frames in.

December 6, 2018 - Crane arrives to place steel I-Beams in place for Common Area.

November 19, 2018 - Open up the hall to the boys locker room and to the stair going to the High School hall.

November 16, 2018 - Metal beams arrived for new part of the Elementary School, concrete poured in old Library part.

November 15, 2018 - Pumping piping going in new Kitchen and Elementary area.

November 6, 2018 - Removing concrete inside old part of library for new cafeteria. New building connected to old building by play ground.

October 30, 2018 - Picture from a Drone

October 22, 2018 - Outside walls being built brick by brick, footing being poured down by building. Inside support beams put in, wall being torn down to make room for the new cafeteria.

October 1, 2018 Pictures of Mrs. Eslinger Office and Mrs. Schulting's old office, the elementary side of the library and the coaches office.

September 20 - Many things happening inside. Elementary side of library empty, Drywall cut out where boys locker room door is. Hallway build for boys to pass to the new locker room entrance, coaches office room cleaned out, wall build next to gym door. Concrete for the new addition being poured.

September 10 - Footing being dug, Bus garage build siding and roof being put on. Inside Books are being move some boxed up and put into storage, other moving to the middle high school side. Construction will start for the new cafeteria.

August 30 - Many things starting to happen, Sidewalk to and from the parking lot, Parking lot blacktopped and lines on, Bus Garage started, fenced in area for construction.

July 31 - Removing last of the concrete, Removing top soil from area, digging down old parking lot using for fill.

July 27 - Leveling, removing concrete, digging for new electric

Door from Multi-purpose room to Shop

July 26 - Moving lots of dirt today

July 23 - Started tearing down ramp, Field shed gone

July 18 - Started leveling for Bus Garage, still working on front.

July 17

July 16

July 13 - Start tearing down

June 2018 - Electricians pulling wiring inside

June 7, 2018 -Ground Breaking

Bus Garage Take Down