This is where our bridge will be constructed. It can't hardly be called a bridge just yet.
NC.M3.G-GMD.4 Identify the shapes of two-dimensional cross-sections of three-dimensional objects, and identify three-dimensional objects generated by rotations of two-dimensional objects.
NC.M3.G-MG.1 Apply geometric concepts in modeling situations • Use geometric and algebraic concepts to solve problems in modeling situations: • Use geometric shapes, their measures, and their properties, to model real-life objects. • Use geometric formulas and algebraic functions to model relationships. • Apply concepts of density based on area and volume. • Apply geometric concepts to solve design and optimization problems.
Students will also take what they've learned and make applications to other connected standards.
We look forward to spring 2021 as these gentlemen and other local builders help us make our plans a reality.
On Tuesday, November 17 and Thursday, November 19, , Ashe County Chief Building Inspector, Mr. Jeff Cornett, joined us at the site to offer pertinent information and ideas for our project.
On Friday, November 20, Josh Scott, owner of Honeysuckle Construction and president of Ashe County Builders Association, visited to answer questions and offer suggestions to our project
Dates to Keep in Mind:
Entry Event/Kick-off:
11/13/2020 Zoom meeting with students to discuss process of designing and building a footbridge with focus on making sure the final project is safe and accessible to all students who may want to enjoy our space.
Checkpoints and Formative Assessments:
11/17 and 11/19 Meet with Ashe County Chief Building Inspector Jeff Cornett to discuss project, ADA specifications and things to consider while designing project.
11/20 Th-F students meet with local builder, Josh Scott to discuss plans and building ideas for bridge, will video and post for M-T students and virtual students as well.
11/20 Th-F students conference w/me during class regarding progress, 11/23 M-T students conference w/Ashley during class regarding progress
11/30 Scale drawing of bridge and Project estimates on building costs due.
Prior to 11/30, students will have one peer review of their work for suggestions or ideas. Students will complete a google form to detail their reviews of scale drawing and material budget list.
12/1(M-T) and 12/4(Th-F) students will share pics of their models w/Ashley for suggestions before turn in date.
Prior to 12/7 students will have one peer review their model suggestions
12/7 3-D Models turned in.
Below are some examples of student work from the design phase of our project.