Anilan are engaged to deliver multi‑site drainage upgrades, slope stabilisation and pavement repairs across Foxground and Wallaby Hill Roads following storm damage. The works included new culvert structures, shotcrete drains, gabion retaining walls, table drain reconstruction and guardrail installation, all delivered under MW21‑LG quality, environmental and safety requirements. The project showcased Anilan’s capability in managing complex civil works in narrow rural corridors while maintaining resident access and minimising disruption.
Anilan are successfully delivering drainage, kerb and gutter upgrades along Church Street, a constrained urban corridor servicing schools, residential properties and the local showground. The project required detailed staging, live‑traffic management, service locating, environmental controls and precise installation of new stormwater infrastructure. Our team executed the works efficiently while maintaining continuous access for stakeholders and with minimal community disruption.
Anilan were engaged to undertake a 900mm pipe culvert replacement in Kootingal over a 48 hour rail Possession.
Anilan were engaged by Transport for NSW to deliver vital culvert replacements along the Barton Highway. These night works improved drainage and enhanced road durability, ensuring safer journeys for all motorists
Anilan contracting have been engaged by West point Group/Ampol to design and construct 4.5km of inground Sewer via directional drilling, open cut excavation and suspended pipework across the M1.This involves engagement of consultants and Authority approvals.
Anilan were engaged to undertake 7 new culvert structure installation & One dual Side Extension along Tullamore Road & Tomingley Road just outside of Narromine.
Anilan have been engaged to undertake the Stormwater Drainage on a new industrial estate, this consists of Installation of Pipes, Precast Pits, GPTs and insitu Pits.
Anilan were engaged by Transport for NSW to deliver vital culvert replacements along the Barton Highway. These night works improved drainage and enhanced road durability, ensuring safer journeys for all motorists
Anilan have been engaged to undertake the northern catchment drainage installation for Narromine Shire Council, The scope consists of the installation of 930 Metres of Open cut 1050 Diameter pipes at depths ranging from 4.5m to 2m in depth Including 23 Large Structural pits , Kerb and gutter replacement & A 130 Metre underbore done by micro tunnelling across the main arterial TFNSW road through Narromine to avoid open cut in this section
Anilan Contracting has been hard at work restoring a vital section of track on the Country Rail Network for UGL and TfNSW. This emergency washout repair is essential to reopening rail access in the region after damage in March.We're committed to keeping vital transport links open for communities and industries alike.
In the development project at Sixteenth Avenue Austral, Anilan is presently overseeing the implementation of stormwater drainage works and the (FRP) package associated with structural pit construction.
Anilan Contracting presently holds a position on the Sydney Trains Wet Plant Hire Panel. This engagement entails a contractual duration of five years, commencing in December 2023, with the provision for a potential extension of two additional years.
Anilan have been engaged to undertake the upgrade of multiple culverts on the Country Rail Network in various locations.
Anilan have been engaged to undertake the addition and modification to the
drainage system at St Johns Catholic School, this consisted of 600m of new
stormwater and a new Jelly fish tank as well as grouting of the redundant
Stormwater line.
Within Claymore Stage 11, Anilan is presently engaged in the construction of 1.8 kilometers of subdivision road drainage, the fabrication of 40 structural pits, and the development of 600 meters of footpaths. These activities collectively contribute to the integral infrastructure enhancement within the project.
Anilan Contracting is currently responsible for the execution of the (FRP) work concerning the soil nail wall capping beam and footing as part of the Mulgoa Road M4 underpass widening project
Anilan Carried Out a new Slip Lane installation and road way alignment for new high rise development. In addition Anilan are undertaking the stormwater drainage upgrades, Demo of existing roadway and excavation, FRP of Kerb and Gutter, LMC Pavement, CRCP Pavement.
Anilan commenced a stormwater drainage upgrade, Demo of existing roadway and excavation, FRP of Kerb and Gutter and CRCP Pavement.
Anilan installed 85m of stormwater up research lane, including watermain diversion and undermining of capping beam, removal of unsuitable foundation material, stabilisation of subgrade and rock mattressing.
Anilan undertook bulk earth works, detailed excavation for road formation, Sewer, stormwater and water mains, FRP kerb, gutter and stormwater pits & OSD basin.
Anilan we engaged to undertake nightshift works to replace and upgrade the stormwater Pits, Pipes and subsoil drainage for Wright Way Civil/Daracon
Anilan Contracting have been working closely with Kennedy Civil and Richard Crookes on a industrial subdivision consisting of over 50 stormwater pits and over 600m of Stormwater pipe. A mixture of Dual, triple and including a large portion of concrete encased quad lines
Anilan we engaged to undertake all bulkearth works, demolition and drainage including drainage structures.
Anilan are undertaking 28 Culvert Extensions along the Newell Highway for TfNSW, our scope as Head Contractor includes Full site establishment including amenities, facilities and supervision. Full Excavation, disposal of spoil, Supply and installation of Aggregate to conformance, Full FRP of base slabs, headwalls and wingwalls and installation of precast crown units.
A 150 lot subdivision project in Gunning, NSW. Our scope of works involved a full sewer installation including 150 diameter sewer main house connections and sewer manholes. Stormwater pipes ranging from 225 - 600 RCP, 375-525 FRC and stormwater pit installation.
Bringelly Road and Kelly Street realignment project for Antoun Civil Engineering. Anilan Contracting are contracted to undertake all bulk earthworks and demolition as well as drainage and drainage structures. We are also highly experienced in the reinstatement of suitable material and concrete works to RMS specifications.