Our first order of business should be the introduction of our Revenue Model and how it is that people can begin participating in the community.
Throughout the Preliminary Specification, People, Ideas & Objects have introduced a number of key concepts. These include the following.
Leakage vs. The Right Information, the Right Time
Industrial Command and Control
Material Balance Report
Operational Control
Pooling
Revenue Model
Work Order
Lastly we have a listing of the Interfaces that have been included in the Preliminary Specification as of the late summer of 2012.