Page Engineering, Inc. has been asked by the Village of Mount Victory to complete a Preliminary Engineering Report to assess the current and future water system needs. The Village has identified the following system improvements to be studied:
Replacement of approximately 80% of the Water Distribution System(water main, water valves, fire hydrants, water service taps, and required surface restoration)
Installation of Remote Water Metering Devices
Replacement of Solid State Starters at Water Treatment Plant
Replacement of Water Meters
Replacement or Rehabilitation of Water Tower
Well Field Improvements (piping, electrical, etc.)