Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Finishing up baseline analysis
Have preliminary list of materials to use for optimization
Accomplishments from Previous Week
Presented design proposal presentation
Cleaned up CAD model for simulations
Generated an FEA simulation of current tool in Solidworks and ANSYS
Cleared up how to approach hand calculations
Determined that safety factor of optimized design should be >2.5
To get a factor of safety of 2.5, the load is around 3750N, or 843lbf
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Fix hand calculations with correct moment of inertias (Nathan)
Research standards necessary for material selection (Kelly)
Look into simulations for composites on ANSYS (Jason)
Brainstorm/CAD geometry ideas for optimized designs (Roy)
Practice using ANSYS (all)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Guided us on how to clean up model for FEA simulations
Notified another design constraint: the envelope on top of the tool cannot be moved since there is a motor placed at the side
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Clarified that in hand calc, we need to perform the calcs at the point of maximum stress
Expressed concern over the validity of loading conditions, given load seems too large
Will bring up during next meeting with sponsors
Discussed the possibility of normalizing safety factor during optimization
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
n/a
Risks and Areas of Concern
Validity of loading conditions
Validity of hand calculations
Resources or Information Required but not Available
How the neutral axes work in hand calculations
Clarification of load conditions
Schedule
Need to start optimization flowchart by end of week
Budget (list amount spent and amount remaining)
n/a
Progress on Report and Webpage
Updated weekly report