Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Working on full scale design analysis
Accomplishments from Previous Week
Individual component analysis
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Research/Rotterdam research (alex)
Vibration (alex and jonathan)
Thermal expansion (and how that effects tension, make sure not over constrained) (adam)
creep (and how that effects tension, make sure not over constrained) (kaveen)
Tension system design decision (everyone)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
After consulting with the sponsor, it was determined that chains was the best design approach. We arrived at this conclusion based on our developed grading system and the sponsor's knowledge.
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Conduct Thermal expansion analysis (Tustaniwskyj 01/10/17)
Fixturing, making sure the ship does not rotate off the blocks (Delson 1/12/17)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Work out presentation issues before presentation. Monday (12/5/16)
Share the responsibility when talking during presentations. Monday (12/5/16)
Risks and Areas of Concern
Thermal expansion: this is a concern because we don’t want the chains expanding or contracting due to temperature changes.
Vibration and ship movement
Scale model
Resources or Information Required but not Available
Industry knowledge on structures, adaptions, and code
Schedule
This week before 1/20
Research/Rotterdam research (alex)
Tension system design decision (everyone)
creep (and how that effects tension, make sure not over constrained) (kaveen)
Thermal expansion (and how that effects tension, make sure not over constrained) (adam)
Vibration (alex and jonathan)
connections (like pad eyes)?
Meeting Tuesday 1/24 after class with sponsor
We will have a meeting with sponsor every following Tuesday as well.
Due 1/27
Failure Mode analysis (FMEACA) (jonothan + kaveen)
Cost analysis (alex)
Materials/Mechanical Systems in Salt Water (adam)
finish analysis (1/30/17)
Final Design choice CAD designs/simulations (2/6/17)
FEM
<model design phase>
complete design of model demonstration (2/13/17)
Scaling (depends on what model we make: superficial or testing of a component)
<start model production phase>
test and optimize components of model demonstration (2/27/17)
finish model demonstration (3/17/17)
Project presentation (3/22/17)
Budget (list amount spent and amount remaining)
Amount spent: $0
Lab fee: $1,800
Amount Remaining : $8,200
Progress on Report and Webpage
Starting this week we will be working on the report.
We have uploaded a lot of information to the internal side of the webpage.
The webpage still requires some work all around.