Deliverables

The project defined four major deliverables, each of which was reviewed by the project Expert Group and then published online, open to the public for reviewing and comments.

The project defined the following deliverables:

  • First Interim study report, which will cover the stocktaking of existing semantic assets and use case assets. Available.
  • Second Interim study report, which will cover a translation to OWL and a mapping between the various models found in the semantic and use case assets. Available + Appendix.
  • Third Interim study report, which will cover the definition of the smart appliances unified ontology and a description of this ontology within the ETSI M2M architecture. Available.
  • Final Study report, which will include all the results described in the previous reports as well as an executive summary. Available + Appendix.

Reviewing (not possible any more)

Each deliverable was first reviewed by the Expert Group as soon as the project team has finalized it. Their review comments were processed and incorporated in the deliverable, which was then published and open for reviewing to the public.

The deliverables are published on this website, submitting review comments was possible on sap.etsi.org.

It was also possible to submit comments for a specific asset/ontology on this website using the comment tab dedicated to this purpose.