 HERE IS A LAYOUT FROM OUR ATLANTIC-MED T SHIRTS.

 

 BEFORE AND AFTER. NEW PAINT.

NEW PAINT AND ANODES FOR HULL AND MAX PROP.

 2 SKETCHES OF THE WOODEN DECORATIVE FRAMES THAT WERE RESEALED.

 DURING AND AFTER THE WINDOW'S JOB. NEW PAINT AND SEALANT.

 

 

INFIDIEN'S DECK PANELS FOR A FUTURE REPLACING.

INFIDIEN'S NEW '09 FACE LIFT, NEW HULL LOOK. CLEAN AND SHINY...

REMOVING THE OLD NON SKID FROM THE DECK IS NOT AN EASY JOB... 

NEW PROP ANTI-FOULING GREASE BY PROP-SHIELD.  (http://www.prop-shield.com)

NEW ANTISLIP (TREADMASTER) IN PLACE.  https://www.treadmaster.co.uk/

NEW WIND GENERATOR.  (http://www.duogen.co.uk/page21.html)

AFTER ALMOST 2 YEARS AT REST (WE WERE DEALING WITH THE ILLNESS AND FINALLY THE LOSS OF OUR BELOVED MOTHER), INFIDIEN WAS WELL COVERED IN LAYERS OF ... SORROW (2017).

FIRST LAYER OF NEW PROP  ANTI-FOULING, NEW PROP ANODE.

NEW HULL ANODES (Χ 6 +2) WITH CUSTOM MADE ALUMINIUM SCREW NUTS (PERFECT ELECTRICAL CONNECTION). (2017)

READY TO BE WET AGAIN.

REBUILDING THE LOFRANS LEOPARD 1500W WINDLASS (2017).

NEW PAINT FOR ENGINE, NEW FUEL HOSES, CLEAN AND GREAT LOOKING ENGINE ROOM!  (2018)

NEW ACRYLIC (PLEXIGLAS) AT FIXED (ALUMINIUM) DODGER, TEST TRANSPARENCY FOR NIGHT USE (2019) 

2022 Work on the below the waterline area

2022 Stage 1: Sanding off old epoxy 

2022 Stage 2: Open up access to keel tank for cleaning (and inspecting the keel)

2021 Stage 3: Preparing aluminium welding (backing plate was used)

2022 Stage 4: Weld's inspection (no red color in the second photo= perfect welds)

2022 Stage 5: Aluminium grinding

2022 Stage 6: Aluminium chromate conversion (Chromate Conversion Coating is a process that converts the aluminum surface properties, unlike plating, which applies a coating onto the aluminum's surface. It is typically used to passivate magnesium, copper, silver, tin, zinc, aluminum, and steel alloys.)

2022 Stage 7: Anti-corrosive epoxy primer

2022 Stage 8 low part of keel Reinforced with epoxy + fabrics, extra layers of anti-corrosive epoxy

2022 Stage 9: Epoxy based sealer

2022 Stage 10: Fouling protection, waterline treatment

2022 Stage 11: Shaft, bearing, anodes

2022 Stage 12: Ready to Launch

2023 NEW STANDING RIGGING