Silverbrook School and Badger Middle School - July 2026
In fall 2027, Silverbrook Intermediate School will become Silverbrook Elementary School, with grades K-5. This summer, there is work taking place inside the building to prepare for the change and reconfigure some space to utilize it for elementary programming. During the 2026-2027 school year, the current 5th grade wing of the building will be closed off as 5th grade students will be in the current elementary schools. While itis closed off, construction workers will put in en-suite bathrooms in the future kindergarten classrooms. Outside the building, the loading dock that was part of the original 1965 building is being replaced along with some of the parking lot to accomodate safer unloading.
At Badger Middle School, the gymnasium is getting a transformation with new bleachers and flooring. A new fire alarm system is being installed, and some old locker room space is being reconfigured into academic spaces.
The old loading dock was the original dock built in 1965. Areas of the parking lot are being remodeled to accomodate big trucks with deliveries.
The new loading dock is taking shape.
The new loading dock is taking shape.
Inside the school, two music rooms will be needed when the school becomes an elementary school in 2027. Another music room is being reconfigured for use by special education.
A music room is being reconfigured for use by special education.
A music room is being reconfigured for use by special education.
A music room is being reconfigured for use by special education.
A music room is being reconfigured for use by special education.
A music room is being reconfigured for use by special education.
Some of the current fifth-grade classrooms will be used for kindergarten so en-suite bathrooms are being added.
Another bathroom being added. The current fifth-grade wing will not be used in 26-27 so construction will continue.
The current fire alarm system is being replaced.
There are several layers to complete, but when it is done, there will be a brand new gymnasium floor.
There are several layers to complete, but when it is done, there will be a brand new gymnasium floor.
The gymnasium floor wood looks good.
Work continues on the floor and new bleachers will be added.
Work continues on the floor and new bleachers will be added.