PIRA Class: 4B60.11
Purpose:Â
Flip a one-meter tube containing lead shot ten times. A thermistor embedded in one end measures the temperature.
Description:
A plastic tube contains 0.5 kg of lead shot and a thermocouple. The tube is rotated in the vertical plane causing the shot to fall. The rotation is repeated 20 times. The initial and final temperatures are measured.
Equipment:
Plastic tube, lead shot, thermocouple/thermistor
Web Simulation:
https://www.youtube.com/watch?v=5yOhSIAIPRE
Location:
Shelf *