How Long Does it Take to Drill a Well?

Having your well has many advantages. From getting an unlimited water supply to getting access to water most cost-effectively, the perks of having a well installed on your property are indeed rewarding. If you’re wondering how long water well drilling will take, let me tell you that the process isn’t just about digging a hole and starting expecting water from it. The pre-installation phase includes steps that must be done before a water well installation can begin. A post-installation stage is essential to ensure you have a well-working well and access to clean and safe water. So, if we talk about all these phases, the entire process can take up to 2 weeks or less.


In this blog, we will learn what this process entails from start to end:


Pre-installation:

The pre-installation process can take from 3 days to a week. Before the professionals start digging a hole, they need to determine the location to provide the best water safety quality and ensure the best water pressure. The water well installation contractors will examine your property where a hole should be dug. Once this is decided, the contractor must ensure you have the permits and licenses to start drilling for water well installation. They can help you get permission from local authorities.


Installation:

Now that the location has been finalized and permissions have been taken, the process of power drilling begins. The aim is to dig a deep hole into the earth's crust to reach the underground freshwater, and the contractors may need to search about 100 feet into the ground to find freshwater. After reaching the freshwater level, a long, carbon steel casing is put into the hole to capture the water. Then, the hole is shielded with cement to get sealed from contaminants that can move into it. This process usually takes one to two days to complete.


Water Testing:

Now you have a water well. But, can you drink and use this water in your homes? Is it safe to drink? This is why the next phase involves water well testing. The test will ensure the water has no contaminants in it. You can expect 2 or 3 days to get this testing done.


Purification of the water:

After ensuring the water is drinkable, you need to determine whether the water is soft or hard. If it is hard water, it will need purification. Hard water comes with calcium and magnesium deposits which are not for your water heater and even for washing clothes. Along with water testing for the well that got installed, purification is also necessary for the soft water supply in your home. The purification process generally takes about one or two days.


Conclusion:

It amalgamates that the entire process of water well installation will take between one to two weeks.