Soil and waste systems shall be installed in accordance with the Building Regulations and installed to ensure that effluent is removed without affecting health or creating unnecessary noise and smell.

  • Waste pipes tightly fitted into the female connection with drainage adaptor on the floor.

  • Waste pipes less than 100mm have end cap installed to prevent smells re-entering the building.

  • SVP clipped at 1.3m centres.

  • Clips fastened with plugs and screws.

  • Hair felt should be used between clip and SVP.

  • SVP insulated within boxing to prevent noise transmission.

  • Clips backed with hair felt or support must be provided within 150mm of joints.

  • Waste pipe work to be insulated against sound.

  • Plasterboard in position prior to installing SVP into roof space to allow for correct size opening.

  • Seal around the pipe to help prevent air leakage.

  • If fire stopping is required, then refer to Building Regulations.

  • SVP terminating to atmosphere via a roof tile should clipped to the trusses at no more than 1.2m intervals.

  • Provide additional timber battens if it is not possible to fix to the truss.

  • Elephant trunk connections to tile vent must be fixed using jubilee clips.

  • Air admittance valve (AAV) installed to SVP.

  • AAV must terminate a minimum of 150mm above the insulation.

  • SVP insulated with a minimum of 25mm of sound insulation.

  • Shower traps must be supported directly below.

  • All waste pipes within floor void should be clipped hair felt backing at 600mm centres.

  • Hair felt used when waste pipes pass through joist webbing to prevent noise created by thermal movement.

  • All waste pipes to be insulated for sound within floor voids and boxings with a minimum of 25mm insulation.

  • All waste pipes underneath the sink must return back to wall and not go through the cupboard flooring.