430 meters.
And the willpower.
That's all we need.
We can save Dead Sea!
Solution:
• about 140 km gravity-fed canal (Haifa-Kaliya)
• 430 m elevation drop
• 2.5-3 km³/year water delivery
• 300-350 MW clean energy
• $3-4 billion investment
• 12-15 years payback
📰 FEATURED IN TIMES OF ISRAEL
Read the full article → Save the Dead Sea. Here’s how.
Full technical documentation for this proposal is available at Zenodo DOI: 10.5281/zenodo.17582703