Bridge Design Project
Bridge Design Project
April 2021
Project overview:
School project
I was tasked to create a bridge that would sufficiently allow for a truck to pass through without collapsing or bending. The bridge had to be of our own design, and could not cost more than $320,000. After designing a successful bridge through "bridge designer 2016 software", I was tasked to make a physical model of my design out of household materials.
I created a unique design inspired by the Fink and Fan truss designs
 Final cost of $318,102.82.
Deck elevation: 24 Meters
15 cm thick concrete wearing surface
Weight of a single 480 kN Permit Loading
Completed in 3 weeks - April 2021
Digital model
Physical model
Physical Model Video + Presentation