We are well on our way! This section of the track is already operational, although the estakáda <-> Šalinburg section is still single-track. Now we are only waiting for the second rail, and for the completion of the modifications of the surrounding terrain.
The first phase of the reconstruction is almost complete! Unfortunately, there was a delay due to the attack on Kraví Hrádek. More information below.
Kolejňůčky a.s. is one of the companies on the KPOS server, that is responsible for operating and building railroads. Her owner Tacudek is looking for the best quality of railroads for everyone. As of 2024, we are tightly cooperating with DPSK and HermaPol unltd. , a an industry-based company, which is providing the neccesary materials for railroad construction. In exchange, Kolejňůčky a.s. is adjusting their plans according to Hermapol's wishes. Our railroads may be used by everyone, who obeys the signals, and keeps the railroads safe
On 12.5.2025, Kraví Hrádek was bombed by player Lukasino4834569.
All three tracks were damaged, and track two is still impassable. Therefore, in the direction of Lukášov -> Estakáda, use the first track, and then the loop.
There were two witnesses to this event, and the server console also testifies.
As a result of this drama, on 10.6.2025, the situation escalated, and DPSK's ties to the official Techmánia discord server were completely severed.
As long as there is uncertainty about further possible attacks, it is in the interest of players to stay away from Šalingrad and Estakáda (stone bridge), since preventive mesures may be taken.
We hope that the conflict will be resolved soon.