2025
(Under Review) Insu Kim, "영흥 청정수소발전 사업, 곡성 호수 에너지파크 양수발전사업" in Korea, KDI's preliminary feasibility study, 10/28/2025.
(Rejected) Insu Kim, "Enhancing Sustainability of Uzbekistan's Fintech Industry Regulatory Sandbox," 2025/26 Economic Development Experience Sharing Program (Knowledge Sharing Program) Researcher Participation Interest Survey, KDI Center for International Development, 10/17/2025. "우즈베키스탄 핀테크 산업규제 샌드박스 지속가능성 증진, 2025/26년 경제발전경험공유사업(KSP) 연구진 참여의향 조사(안)" in Korea.
(Rejected) Insu Kim, "Analysis of power system instability from rising GFL and GFM inverters," KEPCO Research Institute, Korean Electric Power Corporation, Principal Investigator, 164,800,000 KRW, Two Years, October 13, 2025. "GFL 및 GFM 인버터의 비중 증가에 따른 전력망 불안정 현상 분석 기술 개발" (in Korean).
(Under Review) Insu Kim, "인천광역시 주거용 건물 BIPV 통합 최적화 및 탄소 저감 인센티브 모델 개발" (in Korean), Incheon Green Environmental Support Center, PI, 11 Months (February 2026–November 2026), September 24, 2025. "인천광역시 주거용 건물 BIPV 통합 최적화 및 탄소 저감 인센티브 모델 개발" (in Korean).
(Rejected) Insu Kim, "Development of an integrated platform for AI-based energy demand forecasting and operational optimization," Korea Energy Technology Evaluation and Planning, Principal Investigator, 75,000,000 KRW, Five Months (November 2025–March 2026), September 22, 2025. "AI 기반 에너지 수요예측 및 운영 최적화 통합 플랫폼 개발" (in Korean).
(Rejected) Insu Kim, "AI기반 분산전력망 산업 육성사업, AI기반 분산에너지 특화지역 지원" in Korea, KDI's preliminary feasibility study, 9/11/2025.
(Rejected) Insu Kim, "분당복합발전 현대화사업[대체건설사업] , 한전신안1 해상풍력발전사업 " in Korea, KDI's preliminary feasibility study, 6/23/2025.
(Rejected) Insu Kim, The Development of Power Grid Optimization Technologies Using Explainable Artificial Intelligence, KEPCO Research Institute, Korean Electric Power Corporation, Principal Investigator, 164,800,000 KRW, Two Years, August 7, 2025. "설명 가능한 인공지능 기반 전력망 최적화 기술 개발" in Korean.
(Rejected,7/18/2025) Insu Kim, "Modeling and Optimization of Energy Self-Sufficient Data Center Operation Integrated with Small Modular Reactors (SMRs)," Samsung Future Technology Development Program Proposal, 6/18/2025. "소형모듈원자로(SMR) 연동 데이터센터의 에너지 자립 운영 모델링 및 최적화 방안" in Korean.
(Under Review) Insu Kim, "A Study on Fault Response and Impact Analysis on Distribution Systems Due to the Increase of Electric Vehicle Chargers, "Electric Safety R&D Technology Demand Survey Form, Korea Electrical Safety Corporation, 6/18/2025. "전기차 충전기 증가에 따른 고장 대응 및 배전 시스템 영향 분석 연구," 전기안전공사 연구개발(R&D) 기술 수요 조사서 in Korean.
(Under Review) Insu Kim, "Development of Electrical Safety Simulation Evaluation Technology Based on Harmonic Analysis of Renewable Energy-Integrated Distributed Power Resources," Electric Safety R&D Technology Demand Survey Form, Korea Electrical Safety Corporation, 6/18/2025. "재생에너지 연계형 분산전원의 고조파 해석 기반 전기안전 시뮬레이션 평가기술 개발, 전기안전공사 연구개발(R&D) 기술 수요 조사서 in Korean.
(Rejected, 6/2, 2025) Insu Kim, "Research on developing an algorithm to optimize the location and capacity of electric vehicle (EV) charging facilities, and on using the algorithm to increase the utility of EV charging infrastructure in Incheon, Korea," Inha University, Regional Intelligence Innovation Talent Development Initiative, 6,000,000 KRW, Six Months, May 21, 2025. "전기차 충전시설 위치·용량 최적화 알고리즘 개발과 이를 이용한 인천 지역 전기차 충전 인프라 효용성 상승에 관한 연구, 지역지능화혁신인재양성사업" in Korean.
(Rejected, 6/9, 2025) Insu Kim, "Validation of grid forming inverter introduction into distribution system," KEPCO Research Institute, Korean Electric Power Corporation, Principal Investigator, 100,000,000 KRW, Two Years, May 12, 2025. "GFM 인버터의 배전계통 도입 유효성 검토" in Korean.
(Rejected) Insu Kim, "Development of an operation optimization strategy for e-mobility infrastructure based on techno-economic analysis," PI (Inha University), Project Execution Department: National Research Foundation of Korea, 168,000,000 KRW, Three Years, May 9, 2025. "기술·경제성 분석 기반의 e-모빌리티 충전 인프라 운영 최적화 전략 개발, 중견연구(창의연구형)" in Korean.
(Declined, April 4, 2025) Insu Kim, "극한기후에서의 성능저하 및 SOC 감소최소화를 위한 셀 밸런싱 기반 BMS 기법 개발," Main PI (Inha University), Project Title: 2025년도 극지연구 진흥프로그램(PAP)사업 과제 제안서, Project Execution Department: 극지연구소, March 17, 2025, Korean.
(Under Review) Insu Kim, "E-모빌리티 확산에 따른 전선 유지보수 최적화 연구", Main PI (Inha University), Project Execution Department: LS Cable and System, March 7, 2025, Korean.
(Rejected, March 25, 2025) Insu Kim, "변동성 재생에너지 비중 50% 대응 실시간 분산자원 관리 기술 개발", Main PI (Inha University), Project Execution Department: Korea Institute of Energy Research (한국에너지기술연구원 in Korean), February 27, 2025, Korean.
(Declined, April 9, 2025) Insu Kim, "도시가스망 및 Power-to-X 융합을 통한신재생에너지 간헐성 극복 및 종합 에너지 전환 전략 개발," Main PI, Inha University, Project Execution Department: Korea Gas Corporation (가스공사 in Korean), KRW 120,000,000, two years, February 10, 2025, Korean.
2024
(Accepted, 3/31/2025) Insu Kim, "전기차 충전 인프라 최적화 모델을 통한 충전 요구 분산 및 충전 만족도 극대화," Main PI, Inha University, Project Execution Department: Hyundai NGV, November 25, 2024, Korean. 15,000,000 KRW and three months.
(Declined, February 26, 2025) Insu Kim, "Developing e-mobility infrastructure modernization techniques based on techno-economic analysis," Main PI, Inha University, Project Execution Department: National Research Foundation of Korea, 600,000,000 KRW, three years, December 4, 2024. "기술·경제성 분석을 기반으로 한 e-모빌리티 인프라 고도화 기법 개발, 중견연구(유형2 글로벌형)" in Korean.
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
[1] Insu Kim, "The study of protection coordination, harmonic and load flow on the smart grid based distribution systems," Project Execution Department: KEPCO Research Institute, Role: Responsible Investigator for Outsourced Research, October 12, 2015. "신 배전계통의 보호협조, 고조파 및 조류해석에 관한 연구" in Korean.