this internship covered designing reinforced concrete using ETABS in many different slab systems and geometric sections, by applying the structural analysis approaches and taking into account number of load types to obtain the reinforcement needed or check the designed one. On the other hand, in the last week we were dealing with MS project and made a calculation for a project in order to obtain the time needed for the project to be done and then use these information writing and dealing with tenders which was our last subject discussed.