On January 18, 2024, a site visit was conducted as part of the mobilization and demobilization process for the Butuan Office Building Construction project. The primary objective was to conduct a comprehensive site inspection, reviewing initial findings provided by Landbank representatives, with a particular focus on ensuring the ongoing construction site adheres to correct structural practices.
Photos: Images showcase the use of the excavator on site and the verification of the depth of the footing along Grid-4D
Photos: Images showcase the actual status of the project site and meetings with other engineers for the final inspection/observation reports.
Site Inspection: A thorough site inspection was undertaken to evaluate the site's suitability and compliance with correct structural practices. Assessment of the existing structures to ensure stability and conformity to engineering standards.
Photos: Images capturing each aspect of the inspection process, with specific focus on structural elements and soil conditions.