Ruth-Cohn-School (GER)
Ruth-Cohn-School (GER)
Projekt of Harter&Kanzler+Partner (more of this Project)
1st prize competition
Construction period: 2021-2025
Budget: €34M
Secondary school in Denzlingen.
Joined ongoing project as project architect, managing technical coordination and implementation phases. Developed comprehensive ceiling systems, coordinated MEP integration with engineering consultants, and designed custom furniture packages for the entire facility. Led on-site coordination with timber specialists and trades, managed construction detailing, and maintained direct client communication.
Key contributions: integrated ventilation ductwork within classroom built-in cabinetry to maximize space efficiency and architectural quality; resolved complex acoustic requirements for music teaching spaces through detailed coordination with acoustic engineers, achieving KfW 55 energy standard within sustainable timber construction system.