In 2020, Indian Railways carried 808.6 crore (8.086 billion) passengers and in 2022, Railways transported 1418.1 million tonnes of freight.[10][5] It runs 13,169 passenger trains daily, on both long-distance and suburban routes, covering 7,325 stations across India.[5] Mail or Express trains, the most common types of trains, run at an average speed of 50.6 km/h (31.4 mph). Suburban EMUs run at an average speed of 37.5 km/h (23.3 mph). Ordinary passenger trains (incl. mixed) run at an average speed of 33.5 km/h (20.8 mph).[5] The maximum speed of passenger trains varies, with the Vande Bharat Express running at a peak speed of 180 km/h (110 mph).

India's first passenger train, operated by the Great Indian Peninsula Railway and hauled by three steam locomotives (Sahib, Sindh and Sultan), ran for 34 kilometres (21 mi) with 400 people in 14 carriages on 1,676 mm (5 ft 6 in) broad gauge track between Bori Bunder (Mumbai) and Thane on 16 April 1853.[14][15] The Thane viaducts, India's first railway bridges, were built over the Thane creek when the Mumbai-Thane line was extended to Kalyan in May 1854.[16] Eastern India's first passenger train ran 39 km (24 mi) from Howrah, near Kolkata, to Hoogly on 15 August 1854.[1] The first passenger train in South India ran 97 km (60 mi) from Royapuram-Veyasarapady (Madras) to Wallajaroad (Arcot) on 1 July 1856.[17]


Download Indian Train Sim 2023 Mod Apk


Download Zip 🔥 https://urllie.com/2y3i3i 🔥



On 24 February 1873, a horse-drawn 3.8 km (2.4 mi) tram opened in Calcutta between Sealdah and Armenian Ghat Street.[18] On 9 May 1874, a horse-drawn tramway began operation in Bombay between Colaba and Parel.[19] In 1879, the Nizam's Guaranteed State Railway was established which built several railway lines across the then Hyderabad State with Kachiguda Railway Station serving as its headquarters.[20][21] In 1897, lighting in passenger coaches was introduced by many railway companies. On 3 February 1925, the first electric passenger train in India ran between Victoria Terminus and Kurla.[22] On 1926, Erode Trichinopoly line became the fastest ever gauge converted line in entire global railway network history. It had been converted from Meter Gauge to Broad Gauge in just 5 hours of time which became the recorded history and this record could not be broken till date.[23]

The organization of Indian railways into regional zones began in 1951,[24] when the Southern (14 April 1951), Central (5 November 1951), and Western (5 November 1951) zones were created.[25] Fans and lights were mandated for all compartments in all passenger classes in 1951, and sleeping accommodations were introduced in coaches. In 1956, the first fully air-conditioned train was introduced between Howrah and Delhi (Presently known as Poorva Express).[26] Ten years later, the first containerised freight service began between Mumbai and Ahmedabad. In 1974, Indian Railways endured a 20 day strike, which damaged the nation's economy.[27][28]

In 1986, computerized ticketing and reservations were introduced in New Delhi.[29] In 1988, the first Shatabdi Express was introduced between New Delhi and Jhansi; it was later extended to Bhopal.[30] Two years later, the first self-printing ticket machine (SPTM) was introduced in New Delhi.[31] In 1993, air-conditioned three-tier coaches and a sleeper class (separate from second class) were introduced on IR. The CONCERT system of computerized reservations was deployed in New Delhi, Mumbai and Chennai in September 1996. In 1998, coupon validating machines (CVMs) were introduced at Mumbai Chhatrapati Shivaji Maharaj Terminus. The nationwide concierge system began operation on 18 April 1999. In February 2000, the Indian Railways website went online.[32] Individuals can book reserved tickets in online through Indian Railways Catering and Tourism Corporation's (IRCTC) official website (www.irctc.co.in). On 3 August 2002, IR began online train reservations and ticketing.[33] Though in November 2019, the website suffered a data breach exposing the records of 2 million customers including about 583,000 unique email addresses, usernames and passwords in plain text.[34]

On 22 March 2020, Indian Railways announced a nationwide shutdown of passenger rail service to combat the COVID-19 pandemic in India. This became part of a nationwide lockdown to slow the spread of the novel coronavirus.[36] The railway shutdown was initially scheduled to last from 23 to 31 March,[37] but the nationwide lockdown, as announced by Prime Minister Narendra Modi on 24 March, was to last 21 days.[38] The national rail network is maintaining its freight operations during the lockdown, to transport essential goods.[39] On 29 March, Indian Railways announced that it would start service for special parcel trains to transport essential goods, in addition to regular freight service.[40] The national rail operator has also announced plans to convert coaches into isolation wards for patients of COVID-19.[41] The railways have since reopened and were functioning by 2022.

All the unstaffed level crossings had been eliminated by Jan 2019, and staffed level crossings are being progressively replaced by overbridges and underbridges.[62][47] Other safety projects include the extension of an automated fire alarm system, first introduced on Rajdhani Express trains in 2013, to all air-conditioned coaches;[63] and 6,095 GPS-enabled Fog Pilot Assistance System railway signalling devices (replacing the practice of placing firecrackers on tracks to alert train drivers) installed in 2017 in four zones: Northern, North Central, North Eastern and North Western; and replacing ICF coach with LHB coach.

In an unprecedented move, the railways had suspended the services of all passenger trains for 48 days after the lockdown was announced by the PM on 24 March 2020. Its freight trains however continued to run during this period.[64] This was the first time in its entire history that lifeline of the nation was stopped. On 12 May 2020, in first phase, Railways started the Rajdhani Express for 15 cities and began the reservation for the same via IRCTC website an evening before.[65]

Indian Railways is planning to seek investments from private firms to operate passenger trains for the first time. Ministry of Railways identified 109 origin-destination routes via 151 trains asked private companies to submit their interest.[66] Private companies may operate trains by April 2023.[67] This will incorporate modern trains with technological advancements like less maintenance, reduce travel time and create employment. 151 trains will be operated by the by private entities. Each train shall have minimum 16 coaches.[68]

Indian Railways is headed by a Four-member Railway Board whose chairman reports to the Ministry of Railways. The Railway Board also acts as the Ministry of Railways. The officers managing the office of Railway Board are mostly from organised Group A Railway Services and Railway Board Secretariat Service. IR is divided into 18 zones, headed by general managers who report to the Railway Board.[5] The zones are further subdivided into 71 operating divisions, headed by divisional railway managers (DRM).[70][71][72] The divisional officers of the engineering, mechanical, electrical, signal and telecommunication, stores, accounts, personnel, operating, commercial, security and safety branches report to their respective DRMs and are tasked with the operation and maintenance of assets. Station masters control individual stations and train movements through their stations' territory. In addition, there are a number of production units, training establishments, public sector enterprises and other offices working under the control of the Railway Board.[5]

By 1990s, steam locomotives were phased in and electric and diesel locomotives, along with a few CNG (compressed natural gas) locomotives are used.[77] Steam locomotives are used only in heritage trains. Locomotives in India are classified by gauge, motive power, the work they are suited for, and their power or model number. Their four- or five-letter class name includes this information. The first letter denotes the track gauge, the second their motive power (diesel or electric), and the third their suitable traffic (goods, passenger, multi or shunting). The fourth letter denoted the locomotive's chronological model number, but in 2002, a new classification was adopted in which the fourth letter in newer diesel locomotives indicate horsepower range.

A locomotive may have a fifth letter in its name, denoting a technical variant, subclass, or sub-type (a variation in the basic model (or series) or a different motor or manufacturer). In the new diesel-locomotive classification, the fifth letter refines the horsepower in 100-hp increments: A for 100 hp, B for 200 hp, C for 300 hp and so on. In this classification, a WDM-3A is a 3100 hp, a WDM-3D a 3400 hp and a WDM-3F a 3600 hp locomotive.[a] Diesel locomotives are fitted with auxiliary power units, which saves almost 88 percent of fuel during the idle time when a train is not running.[78]

IR has introduced new electric multiple unit (EMU) train sets for long-distance routes. One such, Vande Bharat is under operation and another, its sleeper version, is expected to run from 2023. These train sets are expected to replace locomotive-hauled trains on long-distance routes.[85]

On regional short-distance routes, IR runs Mainline electrical multiple unit (MEMU) or Diesel electrical multiple unit (DEMU) trains, depending on the traction available. These train sets are self-propelled with capability for faster acceleration or deceleration and are expected to reduce congestion on dense routes. Passenger locomotive-hauled trains, having frequent stops, are slowly being replaced with train sets across India.[86]

As of 31 March 2022, IR network spans 128,305 km (79,725 mi) of track length, 102,831 km (63,896 mi) of running track length and 68,043 km (42,280 mi) of route length as stated in Year Book 2021-22.[7] Track sections are rated for speeds ranging from 80 to 200 km/h (50 to 124 mph), though the maximum speed attained by passenger trains is 180 km/h (110 mph) during trial runs. All of the broad-gauge network is equipped with long-welded, high-tensile strength 52kg/60kg 90 UTS rails and pre-stressed concrete (PSC) sleepers with elastic fastenings.[5] ff782bc1db

how to download songs on spotify

download film zombie tsunami

download silence of the lambs movie free

free gift cards game download

download hd wallpaper one piece