What is the FIDIC Gold Book Contract Guide?

    The FIDIC Gold Book Contract Guide is a publication by the International Federation of Consulting Engineers (FIDIC) that provides guidance on the use of the FIDIC Conditions of Contract for Design, Build and Operate Projects (DBO Contract), also known as the Gold Book. The Gold Book is a form of contract that covers the design, construction and operation of a project by a single contractor or a consortium of contractors. The Gold Book is suitable for projects that require a high level of integration and coordination between the design, construction and operation phases, such as water and wastewater treatment plants, power plants, airports, railways and roads. The Gold Book was first published in 2008 and revised in 2019 to align with the other FIDIC contracts. 

    What are the main features and benefits of the Gold Book?

    The Gold Book has several features and benefits that make it attractive for complex and long-term projects, such as: