ELLAINE DE LEON

BRIDGE 2

BRIDGE INSPECTION FORM OF MASONRY ARCH BRIDGE

Bridge 2.xlsx

BRIDGE PHOTOS

Figure 1: Diagonal cracks, missing bricks and vegetation growing on Spandrel wall. Rusty Parapets above and rusty handrail below the bridge. Masonry arch experiencing slight separation in centre of arch.

Figure 2: Brick Abutment experiencing minor pointing deterioration at bottom and graffiti on abutment.


Figure 3: Steel longitudinal reinforcements corroding through concrete. Drainage holes in wooden capping beam.

Figure 4: Gas pipe attached to bridge wing wall with moss growing on wing wall. No damage on towpath. No lighting under the bridge