Tech Center Creation - Summer 2025
California Baptist University Campus Store, Riverside, CA
For this project, I was tasked with creating floor plans that represent the Campus Store as it was, and then creating a design for the new Tech Center, as well as changing the layout of the bookshelves to ensure there was adequate space. I also designed a custom cabinet for storing high value tech products, such as computers and iPads. The Tech Center was created in summer 2025, and is now completed.Â
Before the Tech Center, there were only textbooks and art supplies
After the Tech Center, the books were all pushed to one side, and the tech center took over the other side, with art supplies next to the Tech Center.
Before the Tech Center
Sliding doors on the bottom for easy access to product, while maintaining the look of the main tables and overall color scheme of the store.