Mackay Elementary School
Building updates:
replace/repair roofing
masonry repointing
interior and exterior lighting
replace ceilings
Instructional space improvements:
small addition toward Virginia Street to provide greater flexibility for one-on-one and small-group instruction
added space to bring specialized programming for grades three through five from Maugham to Mackay, making Mackay a hub for students who require language learning disability (LLD) services
Heating and ventilation updates:
upgrade unit ventilators in classrooms
replace corridor radiator/convector
Restrooms & accessibility measures:
renovate restrooms for better use of space, improved functionality and improved accessibility
Safety & security:
two-stage security vestibule to create a physical barrier to the main building
bollards strategically placed to block errant vehicles
door signage for better identification by visitors and emergency responders
window security film for improved shatter resistance
replace exterior doors with improved safety features
new emergency generator to maintain basic building functions during power outages
School grounds improvements:
repave courtyard to replace broken asphalt
Maugham Elementary School
Building updates:
replace/repair roofing
masonry repointing
replace vinyl asbestos tile flooring (with necessary precautions)
Instructional space improvements:
addition (on top of the 2002 addition) to provide greater flexibility for one-on-one and small-group instruction
added space will allow the creation of a preschool hub for all those programs (except Tiger Tots) and provide classrooms for the Integrated Pre-Kindergarten program for students with and without special needs
Heating and ventilation updates:
upgrade unit ventilators in classrooms
replace boiler for improved energy efficiency
Restrooms & accessibility measures
new elevator as part of the second-story addition (the current elevator does not extend to the second floor)
Safety & security:
two-stage security vestibule to create a physical barrier to the main building
bollards strategically placed to block errant vehicles
door signage for better identification by visitors and emergency responders
window security film for improved shatter resistance
replace exterior doors with improved safety features
new emergency generator to maintain basic building functions during power outages
School grounds improvements:
replace existing, worn synthetic turf field
Smith Elementary School
Building updates:
replace/repair roofing
replace windows for function and energy efficiency
interior and exterior lighting
replace ceilings
Instructional space improvements:
small addition to the front of the school to provide greater flexibility for one-on-one and small-group instruction, including three rooms for occupational, physical and speech therapy services
addition will also include a music classroom with storage space (currently instruments are stored in a small locker room behind the stage)
reposition and rewire technology components to transition from patchwork placement to comprehensively designed system
Heating and ventilation updates:
upgrade unit ventilators in classrooms
Restrooms & accessibility measures:
renovate restrooms for better use of space, improved functionality and improved accessibility
Safety & security:
two-stage security vestibule to create a physical barrier to the main building
door signage for better identification by visitors and emergency responders
window security film for improved shatter resistance
replace exterior doors with improved safety features
new emergency generator to maintain basic building functions during power outages, including functions that reduce the risks of flood damage
School grounds improvements:
sitework to improve drainage and the building’s front entrance
Stillman Elementary School
Building updates:
replace/repair roofing
replace windows for function and energy efficiency
replace vinyl asbestos tile flooring (with necessary precautions)
replace ceilings
Instructional space improvements:
small addition extending toward the intersection of Windsor and Tenafly roads to provide greater flexibility for one-on-one and small-group instruction, providing more – and more appropriate – space for Basic Skills, Resource Room, English Language Learners instruction and occupational/physical therapies
shift of preschool programs to Maugham would open up two classrooms at Stillman to allow the creation of a music/instrumental room
added outlets in classrooms to provide for plug-in of instructional technology
Heating and ventilation updates:
upgrade unit ventilators in classrooms
Restrooms & accessibility measures:
new elevator built within the courtyard area just for this purpose (currently stairs are the only option for second-floor access)
renovate restrooms for better use of space, improved functionality and improved accessibility
Safety & security:
two-stage security vestibule to create a physical barrier to the main building
bollards strategically placed to block errant vehicles
door signage for better identification by visitors and emergency responders
window security film for improved shatter resistance
replace exterior doors with improved safety features
new emergency generator to maintain basic building functions during power outages
Tenafly Middle School
Building updates:
replace windows for proper functioning and energy efficiency
cafeteria expansion to accommodate one entire grade at a time for lunch indoors
replace vinyl asbestos tile flooring (with necessary precautions)
replace hallway lockers for improved functionality
replace ceilings
Instructional space improvements:
renovate locker rooms used for required Physical Education classes
replace gym bleachers
update stage and house lighting
Heating, ventilation, and A/C updates:
upgrade unit ventilators in classrooms
replace equipment that supports efficient HVAC, such as electrical panels/wiring, a steam pipe, and switchgear replacement
Restrooms & accessibility measures:
renovate restrooms for better use of space, improved functionality and improved accessibility
Safety & security:
two-stage security vestibule to create a physical barrier to the main building
bollards strategically placed to block errant vehicles
door signage for better identification by visitors and emergency responders
window security film for improved shatter resistance
replace exterior doors with improved safety features
Tenafly High School
Building updates:
replace/repair roofing
replace windows for function and energy efficiency
Instructional space improvements:
renovate locker rooms used for required Physical Education classes
replace gym floor
replace gym bleachers and wall pads; add curtain divider to get twice the use out of that one space
renovate auditorium with updated stage and house lighting; audio/visual and sound systems; ceilings, wall finishes and acoustic panels; and new rear section of seats with accommodations for people who have mobility issues
reposition and rewire technology components
Heating, ventilation, and A/C updates:
upgrade unit ventilators in classrooms
better air circulation equipment for the small gym
improve ventilation through the exhaust of stale air
replace rooftop HVAC units and chillers
Restrooms & accessibility measures:
replace elevator cab
renovate restrooms for better use of space, improved functionality and improved accessibility
new, accessible seating in the auditorium’s rear section
Safety & security:
two-stage security vestibule to create a physical barrier to the main building
bollards strategically placed to block errant vehicles
door signage for better identification by visitors and emergency responders
window security film for improved shatter resistance
replace exterior doors with improved safety features
a 9-foot sound wall at the cafeteria to reduce noise
enclosure for exterior trash receptacle
School grounds improvements:
add multi-sport synthetic turf athletic field (current tennis courts will be demolished to make room for the turf field)
addition of a 4-lane walking track with a fence
improved lighting, dugouts, and scoreboards for athletic facilities
Geissinger Athletic Complex
A new fieldhouse will include:
a concession stand and one single-stall restroom for use by spectators
two male locker rooms with designated restrooms
two female locker rooms with designated restrooms
one all-gender locker room with a designated restroom
coaches office
one single-stall faculty restroom
Athletic Trainer's room
team room
storage
Current fieldhouse will now include:
public restrooms
storage for maintenance and athletic equipment and supplies
Grounds improvements:
resurfaced track
6 new tennis courts to be built, replacing those that will be demolished behind THS
District Office
Building updates:
replace/repair roofing
masonry repointing
Heating, ventilation, and A/C updates:
replace boiler and associated components for improved energy efficiency
replace rooftop HVAC units to stop the cycle of repairs and operate more efficiently
Restrooms & accessibility measures:
renovate restrooms for better use of space, improved functionality and improved accessibility