Mold inspection is done by checking mold porosity, lettering pattern and Depth on mold surface, and other mold component to come with correct drawing (Specification).
Disassemble mold or Dies into each single component to be further repaired
Mold cleaning using sandblast method and ensuring the mold has been sandblasted. SHI can also clean the mold using dry ice and laser methods.
Drilling the mold by inserting drill bit 1-2 times to ensure there are no clogged vent holes and using wind pressure on the vent holes.
Clean every part of the Housing and Spring Vent in every hole in the mold.
Drilled the mold to clean the Vent Plug holes and replace the vent plug.
Replace the worn or damaged recoil in each mold.
Engraving weekly serial on each mold that will be processed and replace or install the weekly serial according to the standard guidelines for annual weekly serial replacement.
Prepare and assemble the necessary component (Mold, Container, Beadring, TCR BCR, Bladder) based on the request of the customer.
Check the dimensions of lettering mold letters or numbers with a depth gauge and caliper, check with rubbing mold process, fill out a QC check sheet and ensure the mold matches with the specification from the customer.
Handling mold installation to the curing machine for production use and lowering the mold from the curing machine after the mold is used for production.