Must be a Tesla Certified Installer
Equipment orders must be placed through DirectPay
Orders must be placed at least five (5) days before the preferred delivery date
Tesla Powerwalls must be DC-coupled only (no third-party inverters), Qcells modules, and other domestic content-qualified components must be used; see the Approved Vendor List (AVL) for details
Contractor must pair GoodLeap’s panels (Q-Cells) with a Tesla Powerwall 3, domestic content qualified racking and components, and a Tesla expansion pack (if applicable)
Powerwalls must be DC-coupled (third-party inverters are not authorized)
All delivered equipment must be installed at the designated delivery site
In the event any delivered Equipment is not installed in accordance with this Addendum or the Agreement, Contractor will be liable to GoodLeap and pay $500 per each panel that is not installed or returned in accordance with GoodLeap and Greentech Renewable’s return policies.
System and design specifications cannot be changed once Equipment has shipped
Project must comply with 2024 IRS/Treasury domestic content eligibility guidelines