Refurbishment

Proposed refurbishment of Foyer and Fielding Room

All the current architectural drawings are shown below, although drawings 01, 02, 03 and 04 need further revisions to incorporate the latest details of the screens.  Most of these incorporate a significant amount of technical detail.   Probably the two that are most useful for gaining a quick understanding of the project are drawings 10 and 11.  Drawing 10 shows the Fielding Room integrated with the Foyer with the screens open, with a possible furniture layout based on the retention of existing furniture.  Drawing 11 shows the Fielding Room separated from the Foyer with the screens closed, and the room set out for a formal meeting.  Note that to the maximum extent possible surplus furniture is shown stored in the furniture cupboard, leaving the room as un-cluttered as possible.  This drawing also shows the relationship of the doors within the screens to the Foyer and Corridor.

Ċ
Philip Spencer,
Jan 17, 2017, 1:43 AM
Ċ
Philip Spencer,
Jan 17, 2017, 1:43 AM
Ċ
1158-03a.pdf
(1385k)
Philip Spencer,
Jan 17, 2017, 1:44 AM
Ċ
1158-04a.pdf
(1679k)
Philip Spencer,
Jan 17, 2017, 1:44 AM
Ċ
Philip Spencer,
Jan 17, 2017, 1:44 AM
Ċ
Philip Spencer,
Jan 17, 2017, 1:44 AM
Ċ
Philip Spencer,
Feb 19, 2017, 6:25 AM
Ċ
Philip Spencer,
Feb 19, 2017, 6:25 AM
Ċ
Philip Spencer,
Feb 19, 2017, 6:25 AM
Ċ
Philip Spencer,
Feb 19, 2017, 6:26 AM
Ċ
Philip Spencer,
Feb 19, 2017, 6:26 AM
Comments