Recent site activity

UNITEC-1 Call Sign

1514days since
UNITEC-1 Launch

Filename Format

Operators must follow the filename format for your uploading files about Path Prediction Data and Receiving Data to Archive page.

Filename Format for Path Prediction Data

    PPD_YYMMDD_GSname_OrbitElements#.txt
    
    Example:PPD_100518_1-3_Kyushu_1.txt

Filename Format for Reception Report Data

    Datatype_YYMMDD_DownlinkID_GSname_OrbitElements#.*
    Example:SRD_100518_1-3_Kyushu_2.txt

Filename Format Description

    Datatype
        PPD : Path Prediction data
        SRD : Spectran output text, wave data
        AC : Antenna control log
        AR-WAV : Output wave data from AR-ALPHA(Only if you have AR-ALPHA receiver)

        *When uploading other data not described above, please define the datatype name by yourself.
   
    YYMMDD
       
example) 2010.May.15th -> 100515

    DownlinkID
       
Please refer the "CycleOperationPlan" sheet on the bottom of this page.
       
If you receive the downlink starting at hh:mm:ss, please select the matching Downlink ID(x-y)

    GSName
       Please write your ground station name here. Please use the name described on UNITEC-1 Ground Station Network page.      

    OrbitElements#
   
    Please select the following number as to your using initial orbit condition.
   
     1: t_epoch = 2010/05/20 22:46:20 (UTC)
            x = -8386.536214 km
            y = 7748.324875 km
            z = -6677.030000 km
            Vx = -7805.449103 m/s
            Vy  = -747.877657 m/s
            Vz = -4141.600000 m/s


        N/A:   If an antenna controlled manually, put N/A on OrbitElements#.

    Filename Example:
        SRD_100518_1-3_Kyushu_2.txt
        SRD_100518_1-3_Kyushu_2.wav
        AR-WAV_100518_1-3_Kyushu_2.wav
        SRD_100518_2-6_Katsuura_N/A.txt

Reference for DownlinkID

Please use each number referring following operation schedules.
Note for Operation No. (Please see the details in Downlink Specification page.)
Time [sec.] (hh:mm:ss)
Operation Duration [sec.] Operation Number
0  (Waiting) 600  1
600 (0:10:00) [Downlink]Orbital determination downlink 120  2
720 (0:12:00)  (Waiting) 3480  3
4200 (1:10:00) [Downlink]Orbital determination downlink 120  4
4320 (1:12:00)  (Waiting) 3480  5
7800 (2:10:00) [Downlink]Major downlink 2461  6
10261 (2:51:01)  (Waiting) 1176  7
11437 (3:10:37) [Downlink]Orbital determination downlink 120  8
11557 (3:12:37)  (Waiting) 3480  9
15037 (4:10:37) [Downlink]Orbital determination downlink 120  10
15157 (4:12:37)  (Waiting) 3480  11
18637 (5:10:37) [Downlink]Minor downlink 2056  12
20693 (5:44:53)  (Waiting) 1056  13
21749 (6:02:29) End  

CycleOperationPlan



Comments