Moving a Solargon


The relocation of the Solargon 20 can be accomplished in two ways...disassemble or fully assembled in one piece. A permit was required to move the assembled building from Loveland to Fort Collins, Co. The wide load (20 feet) was a night time low traffic affair that went smoothly.
        Shown here being lifted with two fork lifts to allow the flatbed trailer to
        drive under the building. 
 Loaded and ready for the move.
 
Solargon being lowered at the new location in the wee hours of morning.