Welcome to R-APDRP DoP,Nagaland

Introduction 
The Govt. of India has proposed to continue R-APDRP during the XI Plan with revised terms and conditions as a Central Sector Scheme. The focus of the programme shall be on actual, demonstrable performance in terms of sustained loss reduction. Establishment of reliable and automated systems for sustained collection of accurate base line data, and the adoption of Information Technology in the areas of energy accounting will be essential before taking up the regular distribution strengthening projects. 

Programme Coverage
It is proposed to cover urban areas - towns and cities with population of more than 30,000 (10,000 in case of special category states). In addition, in certain high-load density rural areas with significant loads, works of separation of agricultural feeders from domestic and industrial ones, and of High Voltage Distribution System (11kV) will also be taken up. 
Further, towns / areas for which projects have been sanctioned in X Plan R-APDRP shall be considered for the XI Plan only after either completion or short closure of the earlier sanctioned projects. 

Proposed Scheme
Projects under the scheme shall be taken up in Two Parts. Part-A shall include the projects for establishment of baseline data and IT applications for energy accounting/auditing & IT based consumer service centres. Part-B shall include regular distribution strengthening projects. The activities to be covered under each part are as follows: 

Part - A:
Preparation of Base-line data for the project area covering Consumer Indexing, GIS Mapping, Metering of Distribution Transformers and Feeders, and Automatic Data Logging for all Distribution Transformers and Feeders and SCADA / DMS system (only in the project area having more than 4 lacs population and annual input energy of the order of 350 MU). It would include Asset mapping of the entire distribution network at and below the 11kV transformers and include the Distribution Transformers and Feeders, Low Tension lines, poles and other distribution network equipment. It will also include adoption of IT applications for meter reading, billing & collection; energy accounting & auditing; MIS; redressal of consumer grievances; establishment of IT enabled consumer service centres etc. The base line data and required system shall be verified by an independent agency appointed by the Ministry of Power. The list of works is only indicative.

Project at a Glance:
ITC: Zensar Technologies
ITIA: Tata Consultancy Services Limited

Under Part-A of R-APDRP launched by MoP, 9 towns namely Dimapur, Kohima, Chumukedima, Mokokchung, Mon, Phek, Tuensang, Wokha, Zunheboto are eligible In Nagaland.The scope of ITIA for RAPDRP PART–A scheme comprises following project activities to be completed by ITIA:

  1. Meter Data Acquisition 
  2. Energy Audit 
  3. New Connection 
  4. Disconnection & Dismantling 
  5. GIS based customer Indexing and asset mapping 
  6. GIS based integrated network analysis module 
  7. Centralized Customer Care Services 
  8. Management Information System (MIS) 
  9. Web Self Service 
  10. Identity and Access Management system 
  11. System Security Requirement

Project Objectives

  • Improving financial viability of State Power Utilities
  • Reduction of AT & C losses
  • Improving customer satisfaction
  • Increasing reliability &quality of power supply

Recent List Items

TitleAssigned ToStatusPriorityDue Date% Complete
Customer Care Centre Design High Level Design, Low Level Design for CustomerCare Centre (CCC)  TCS Closed High  100% 
SDO and other office HLD and LLD Submission TCS Closed High  100% 
LOA to TCS  TCS  Active High  100% 
Hardware Installation TCS  Active Medium  20% 
GIS based Customer Indexing(Approved by utility) TCS  Active High  0% 
Showing 5 items from page Tasks sorted by edit time. View more »

Rolling Updates

  • Project Updates Consumer survey started in Dimapur Town on 26 July 2013Asset survey completed in Dimapur and Chuumukdima Town.Lan Cabling is completed in SDO's and Other Offices in all ...
    Posted Nov 9, 2013, 9:13 PM by DoP Nagaland

  • Posted Nov 9, 2013, 9:48 AM by DoP Nagaland
Showing posts 1 - 2 of 2. View more »

Recent Files

Showing 0 files from page Release 1.0.

Deliverables