D1.1 Micro-turn architecture for ASR and SLU (Month 12)






—



Showing 48 items
DeliverableResponsibleDelivery dateEnd monthWP
Sort 
 
Sort 
 
Sort 
 
Sort 
 
Sort 
 
DeliverableResponsibleDelivery dateEnd monthWP
D1.1 Micro-turn architecture for ASR and SLU 3 UCAM 31 October 2012 12 
D1.2 ASR and SLU modules for conversational web-search 2 UNIGE 30 April 2014 30 
D1.3 On-line adaptation of ASR and SLU 2 UNIGE 31 July 2014 33 
D2.1 Micro-turn POMDP Interaction Manager 3 UCAM 28 February 2013 16 
D2.2 Dynamic micro-turn POMDP Interaction Manager 3 UCAM 31 July 2014 33 
D2.3 User simulations and trained IM policies 1 HWU 30 April 2014 30 
D3.1 Incremental NLG and TTS components 1 HWU 28 February 2013 16 
D3.2 Adaptive, spatially-aware spoken output 1 HWU 31 July 2014 33 
D3.3 Methods for porting trainable spoken output 3 UCAM 31 July 2014 33 
D3.4 Adaptive HMM-based speech synthesiser 3 UCAM 30 April 2014 30 
D4.1 Open Information Extraction using shallow semantic parsing 2 UNIGE 28 February 2013 16 
D4.2 Incremental construction of ontologies 5 CRSA 28 February 2013 16 
D4.3 Definition of the User Model 5 CRSA 28 June 2013 20 
D4.4 Survey of ontology-based natural language query analysis 5 CRSA 30 April 2014 30 
D5.1 Hyper-Local content discovery and representation 4 YIS 29 June 2012 
D5.2 Interactive hyper-local search API 4 YIS 30 August 2013 30 
D5.3 Interactive social search and collaborative filtering 5 CRSA 30 April 2014 30 
D5.4 Interactive search refinement 4 YIS 31 July 2014 33 
D6.1 Requirements analysis report and architecture definition 6 ISOCO SA 30 April 2012 
D6.2 Evaluation strategy and criteria for main evaluation 1 6 ISOCO SA 31 October 2012 12 
D6.3 Integrate and test System 1A and 1B 6 ISOCO SA 28 February 2013 16 
D6.4 Evaluate System 1A and 1B 6 ISOCO SA 30 April 2013 18 
D6.5 Evaluation strategy and criteria for main evaluation 2 6 ISOCO SA 28 June 2013 20 
D6.6 Integrate and test System 2A and 2B 6 ISOCO SA 30 April 2014 33 
D6.7 Evaluate System 2A and 2B 6 ISOCO SA 31 October 2014 36 
D7.1 Public Website 1 HWU 31 January 2012 
D7.2 Dissemination and exploitation plan 6 ISOCO SA 30 April 2012 
D7.3 Dissemination and exploitation interim report 6 ISOCO SA 31 October 2013 24 
D7.4 Dissemination and exploitation final report 6 ISOCO SA 31 October 2014 36 
D8.1 Project Wiki set-up 1 HWU 31 January 2012 
D8.2.1 Six-monthly periodic activity 1 HWU 30 April 2012 
D8.2.2 Annual periodic activity and financial reports 1 HWU 31 October 2012 12 
D8.2.3 Six-monthly periodic activity 1 HWU 30 April 2013 18 
D8.2.4 Annual periodic activity and financial reports 1 HWU 31 October 2013 24 
D8.2.5 Six-monthly periodic activity 1 HWU 30 April 2014 30 
D8.2.6 Annual periodic activity and financial reports 1 HWU 31 October 2014 36 
D8.2.7 Final Report 1 HWU 31 October 2014 36 
D8.3.1 Management guide and updates 1 HWU 31 January 2012 
D8.3.2 Management guide and updates 1 HWU 31 October 2012 12 
D8.3.3 Management guide and updates 1 HWU 31 October 2013 24 
MS1 Requirements analysis and theory for conversational search 6 ISOCO SA 30 April 2012  
MS2 Initial micro-turn architecture design, protocols and module interfaces 6 ISOCO SA 31 July 2012  
MS3 Integrated incremental, interactive, hyper-local search (System 1) 1 HWU 28 February 2013 16  
MS4 Evaluation of integrated incremental, interactive, hyper-local search (System 1) 6 ISOCO SA 28 June 2013 20  
MS5 Initial version of incremental, adaptive, personalised, hyper-local search (System 2) 1 HWU 31 October 2013 24  
MS6 Short evaluation of final version of incremental, adaptive, hyper-local search (System 2) 6 ISOCO SA 31 December 2013 26  
MS7 Final version of incremental, adaptive, personalised, hyper-local search (System 2) 1 HWU 31 July 2014 33  
MS8 Evaluation of final version of incremental, adaptative, personalised, hyper-local search (System 2) 6 ISOCO SA 31 October 2014 36  
Showing 48 items