Gas Wells‎ > ‎

1. El Paso #11

The first El Paso well in the Santa Maria area, south of Como, was drilled in the fall of 2010. This well is referred to as CDOW 11-13-10-76. The  documentation filed with COGCC includes:

The image below shows this well and the directional drilling going from below the well platform and heading off to the south and slightly west. Note that the topographic map used is very dated, and does not correctly show the local roads. The second map below will give a much better sense of where this well sits relative to the local roads and subdivisions.

 
 
 
The image below shows the location of all three wells permitted to El Paso in this area as of Feb 2011:
 
Č
Ċ
ď
John Marlin,
Aug 15, 2011, 10:39 PM
Ċ
ď
John Marlin,
Aug 15, 2011, 10:37 PM
Ċ
ď
John Marlin,
Feb 15, 2011, 10:40 PM
Ċ
ď
John Marlin,
Feb 15, 2011, 10:41 PM
Ċ
ď
John Marlin,
Feb 15, 2011, 10:44 PM
ą
ď
John Marlin,
Feb 11, 2011, 11:59 PM
Ċ
ď
John Marlin,
Feb 11, 2011, 11:49 PM
Comments