About Professor Ying

姓名應國卿
職稱教授
最高學歷國立台灣科技大學 工業管理 博士
研究領域生產排程與組合最佳化等相關研究
研究室科技大樓931
聯絡電話(02)2771-2171 ext.2308
E-Mailkcying@ntut.edu.tw

Dr. Kuo-Ching Ying has published more than 60 papers in refereed journals.
The following are some recent publications.

期刊論文
  1. K. C. Ying and S. W. Lin*, A high performing constructive heuristic for minimizing makespan in permutation flowshops, Journal of Industrial and Production Engineering, (Accepted 2013/09/05). (TSSCI) NSC 102-2221-E-027-056. 本人為第一作者.
  2. K. C. Ying and S. W. Lin* (2013), Efficient wafer sorting scheduling using a hybrid artificial immune system. Journal of the Operational Research Society, (Accepted 2013/01/03). (SCI). NSC 100-2221-E-027-040-MY2. 本人為第一作者.
  3. S. W. Lin, K. C. Ying* and Chien-Yi Huang (2013, Aug), Minimizing makespan in distributed permutation flowshops using a modified iterated greedy algorithm, International Journal of Production Research, 51(16), 5029-5038. (SCI). NSC 100-2221-E-027-040-MY2. 本人為通訊作者.
  4. S. W. Lin* and K. C. Ying (2013, June). Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm. Computers and Operations Research, 40(6), 1625-1647. (SCI). NSC 99-2628-E-027-003.
  5. S. W. Lin, K. C. Ying* and Chien-Yi Huang (2013, May), Multiprocessor task scheduling in multistage hybrid flowshops: A hybrid artificial bee colony algorithm with bi-directional planning. Computers and Operations Research, 40(5), 1186-1195. (SCI). NSC 100-2221-E-027-040-MY2. 本人為通訊作者.
  6. S. W. Lin and K. C. Ying* (2013, Apr). Minimizing makespan in a blocking flowshop using a revised artificial immune system algorithm. OMEGA-International Journal of Management Science, 41(2), 383-389. (SCI). NSC 99-2628-E-027-003. 本人為通訊作者.
  7. S. W. Lin and K. C. Ying* (2013, Feb). Increasing the total net revenue for single machine order acceptance and scheduling problems using an artificial bee colony algorithm. Journal of the Operational Research Society, 64(2), 293-311. (SCI). NSC 99-2628-E-027-003. 本人為通訊作者.
  8. K. C. Ying, Z. J. Lee and S. W. Lin* (2012, Oct). Makespan minimization for scheduling unrelated parallel machines with setup times. Journal of Intelligent Manufacturing, 23(5), 1795-1803. (SCI). NSC 99-2628-E-027-003. 本人為第一作者.
  9. S. W. Lin, C. Y. Huang, C. C. Lu and K. C. Ying* (2012, Oct). Minimizing total flow time in permutation flowshop environment. International Journal of Innovative Computing Information and Control, 8(10A), 6599-6612. (SCI). NSC 99-2628-E-027-003. 本人為通訊作者.
  10. S. W. Lin, K. C. Ying, Chou-Yuan Lee and Z. J. Lee* (2012, Oct). An intelligent algorithm with feature selection and decision rules applied to anomaly intrusion detection. Applied Soft Computing Journal, 12(10), 3285-3290. (SCI).
  11. C. C. Lu, S. W. Lin and K. C. Ying* (2012, Aug). Robust scheduling on a single machine to minimize total flow time. Computers and Operations Research, 39(7), 1682-1691. (SCI). NSC 100-2221-E-027-040-MY2. 本人為通訊作者.
  12. S. W. Lin and K. C. Ying* (2012, Aug). Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times. European Journal of Industrial Engineering, 6(4), 474-496. (SCI). NSC 99-2628-E-027-003. 本人為通訊作者.
  13. K. C. Ying, Z. J. Lee, C. C. Lu and S. W. Lin* (2012, Jun). Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence dependent family setups. International Journal of Advanced Manufacturing Technology, 58(5-8), 671-682. (SCI). NSC 99-2628-E-027-003. 本人為第一作者.
  14. K. C. Ying (2012, May). Scheduling identical wafer sorting parallel machines with sequence-dependent setup times using an iterated greedy heuristic. International Journal of Production Research, 50(10), 2710-2719. (SCI). NSC 99-2628-E-027-003. 本人為第一作者、通訊作者.
  15. K. C. Ying and S. W. Lin* (2012, May). Unrelated parallel machines scheduling with sequence- and machine-dependent setup times and due date constraints. International Journal of Innovative Computing Information and Control, 8(5), 3279-3297. (SCI). NSC 100-2221-E-027-040-MY2. 本人為第一作者.
  16. K. C. Ying (2012, Apr). Minimizing makespan for multistage hybrid flowshop scheduling problems with multiprocessor tasks by a hybrid immune algorithm. European Journal of Industrial Engineering, 6(2), 199-215. (SCI). NSC 98-2221-E-027-117. 本人為第一作者、通訊作者.
  17. C. Y. Huang*, H. H. Huang and K. C. Ying (2012, Mar). Sn-Cu-Ni soldering process optimization using multivariate Analysis. IEEE Transactions on Components Packaging and Manufacturing Technology, 2(3), 527-535. (SCI).
  18. H. M. Cheng and K. C. Ying* (2011, Jun). Minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times. Expert Systems with Applications, 38(12), 15517-15522. (SCI). NSC 98-2221-E-027-117. 本人為通訊作者.
  19. C. Y. Huang*, Y. H. Lin, K. C. Ying and C. L. Ku (2011, May). The solder paste printing process: critical parameters, defect scenarios, specifications, and cost reduction. Soldering & Surface Mount Technology, 23(4), 211-223. (SCI).
  20. S. W. Lin, Z. J. Lee, K. C. Ying* and C. C. Lu (2011, May). Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates. Computers and Operations Research, 38(5), 809-815. (SCI). NSC 99-2628-E-027-003. 本人為通訊作者.
  21. K. C. Ying, S. W. Lin, Z. J. Lee* and I. L. Lee (2011, Mar). A novel function approximation based on robust fuzzy regression algorithm model and particle swarm optimization. Applied Soft Computing, 11(2), 1820-1826. (SCI). NSC 97-2221-E-211-017. 本人為第一作者.
  22. S. W. Lin, C. C. Lu and K. C. Ying* (2011, Mar). Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints. International Journal of Advanced Manufacturing Technology, 53(1-4), 353-361. (SCI). NSC 98-2221-E-027-117. 本人為通訊作者.
  23. S. W. Lin, Z. J. Lee, K. C. Ying* and R. H. Lin (2011, Feb). Meta-heuristic algorithms for wafer sorting scheduling problems. Journal of the Operational Research Society, 62(1), 165-174. (SCI). NSC 97-2221-E-027-121. 本人為通訊作者.
  24. K. C. Ying, S. W. Lin* and C. C. Lu (2011, Jan). Cell formation using a simulated annealing algorithm with variable neighbourhood. European Journal of Industrial Engineering, 5(1), 22-42. (SCI). NSC 97-2221-E-027-121. 本人為第一作者.
  25. S. W. Lin, K. C. Ying*, C. C. Lu and J. N. D. Gupta (2011, Jan). Applying multi-start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times. International Journal of Production Economics, 130(2), 246-254. (SCI). NSC 99-2628-E-027-003. 本人為通訊作者.
  26. K. C. Ying and S. W. Lin* (2011, Jan), Service science: the trend and the future core, Journal of the Chinese Institute of Industrial Engineers, 28(1), 1-2. (EI, TSSCI). 本人為第一作者.
  27. S. W. Lin, K. C. Ying* and Z. J. Lee (2010, Jun). Part-machine cell formation in group technology using a simulated annealing-based meta-heuristic. International Journal of Production Research, 48(2), 3579-3591. (SCI). NSC 97-2221-E-027-121. 本人為通訊作者.
  28. Z. J. Lee, S. W. Lin and K. C. Ying* (2010, May). Scheduling jobs on dynamic parallel machines with sequence-dependent setup times. International Journal of Advanced Manufacturing Technology, 47(5-8), 773-781. (SCI). NSC 97-2221-E-027-121. 本人為通訊作者.
  29. K. C. Ying, J. N. D. Gupta, S. W. Lin* and Z. J. Lee (2010, Apr). Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups. International Journal of Production Research, 48(8), 2169-2184. (SCI). 本人為第一作者.
  30. Kuo-Ching Ying and Hui-Miao Cheng* (2010, Apr). Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic. Expert Systems with Applications, 37(4), 2848-2852. (SCI). NSC 98-2221-E-027-117. 本人為第一作者者.
  31. Z. J. Lee, K. C. Ying, S. C. Chen and S. W. Lin* (2010, Apr). Applying PSO-based BPN to predict the yield rate of DRAM modules produced by defective ICs. International Journal of Advanced Manufacturing Technology, 49(9-12), 987-999. (SCI). NSC 97-2410-H-182-020-MY2.
  32. K. C. Ying, S. W. Lin, Z. J. Lee* and Y. T. Lin (2010, Mar). An ensemble approach applied to classify spam E-mails. Expert Systems with Applications, 37(3), 2197-2201. (SCI). 本人為第一作者.
  33. C. Y. Lee, Z. J. Lee*, S. W. Lin and K. C. Ying (2010, Mar). An enhanced ant colony optimization (EACO) applied to capacitated vehicle routing problem. Applied Intelligence, 32(1), 88-95. (SCI).
  34. K. C. Ying* and S. W. Lin (2009, Dec). Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic. International Journal of Production Research, 47(13), 3525-3538. (SCI). NSC 96-2221-E-211-009. 本人為第一作者、通訊作者.
  35. K. C. Ying (2009, Oct). An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks. Journal of the Operational Research Society, 60(6), 810-817. (SCI). NSC 96-2221-E-211-009. 本人為第一作者、通訊作者.
  36. H. M. Cheng* and K. C. Ying (2009, Sep). The causality of hourly price-volume relationship: An empirical study of mini Taiwan exchange futures. Expert Systems with Applications, 36(3), 4896-4899. (SCI).
  37. S. W. Lin, J. N. D. Gupta, K. C. Ying* and Z. J. Lee (2009, Aug). Using simulated annealing to scheduling a flowshop manufacturing cell with sequence dependent family setup times. International Journal of Production Research, 47(12), 3205-3217. (SCI). NSC 96-2221-E-211-009. 本人為通訊作者.
  38. K. C. Ying*, S. W. Lin and Z. J. Lee (2009, May). Hybrid-directional planning: improving improvement heuristics for scheduling resource-constrained projects. International Journal of Advanced Manufacturing Technology, 41(3-4), 358-366. (SCI). NSC 95-2221-E-211-009. 本人為第一作者、通訊作者.
  39. H. M. Cheng and K. C. Ying* (2009, Apr). Testing the significance of solar term effect in the Taiwan stock market. Expert Systems with Applications, 36(3), 6140-6144. (SCI). 本人為通訊作者.
  40. K. C. Ying*, S. W. Lin and C. Y. Huang (2009, Apr). Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic. Expert Systems with Applications, 36(3), 7087-7092. (SCI). NSC 95-2221-E-211-009. 本人為第一作者、通訊作者.
  41. S. W. Lin, K. C. Ying* and Z. J. Lee (2009, Apr). Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times. Computers and Operations Research, 36(4), 1110-1121. (SCI). NSC 96-2221-E-211-009. 本人為通訊作者.
  42. K. C. Ying* and S. W. Lin (2009, Mar). Raising the hit rate for wafer fabrication by a simple constructive heuristic. Expert Systems with Applications, 36(2), 2894-2900. (SCI). NSC 96-2221-E-211-009. 本人為第一作者、通訊作者.
  43. S. W. Lin* and K. C. Ying (2009, Mar). Applying a hybrid simulated annealing and tabu search approach to non-permutation flowshop scheduling problems. International Journal of Production Research, 47(5), 1411-1424. (SCI).
  44. S. W. Lin, Z. J. Lee*, K. C. Ying and C. Y. Lee (2009, Mar). Applying hybrid meta-heuristics for capacitated vehicle routing problems. Expert Systems with Applications, 36(2), 1505-1512. (SCI).
  45. S. W. Lin*, K. C. Ying, S. C. Chen and Z. J. Lee (2008, Nov). Particle swarm optimization for parameter determination and feature selection of support vector machines. Expert Systems with Applications, 35(4), 1817-1824. (SCI). NSC 96-2416-H-211-002.
  46. K. C. Ying (2008, Sep). Minimizing earliness-tardiness penalties for common due date single-machine scheduling problems by a recovering beam search algorithm. Computers and Industrial Engineering, 55(2), 494-502. (SCI). NSC 96-2221-E-211-009. 本人為第一作者、通訊作者.
  47. K. C. Ying (2008, Aug). Solving non-permutation flowshop scheduling problems by an effective iterated greedy heuristic. International Journal of Advanced Manufacturing Technology, 38(3-4), 348-354. (SCI). 本人為第一作者、通訊作者.
  48. S. W. Lin* and K. C. Ying (2008, Mar). A hybrid approach for single-machine tardiness problems with sequence-dependent setup times. Journal of the Operational Research Society, 59(6), 1109-1119. (SCI).
  49. Z. J. Lee*, C. P. Lin, K. C. Ying and S. W. Lin (2008, Feb). An intelligent system based on analytic hierarchy process and fuzzy logic applied to evaluate the software quality of Smartphone. Far East Journal of Experimental and Theoretical Artificial Intelligence, 1(1), 71-86.
  50. S. W. Lin* and K. C. Ying (2007, Aug). Solving single machine total weighted tardiness problems with sequence-dependent setup times by meta-heuristics. International Journal of Advanced Manufacturing Technology, 34(11-12), 1183-1190. (SCI).
  51. Z. J. Lee*, C. C. Chuang and K. C. Ying (2007, Aug). An intelligent algorithm for scheduling jobs on a single machine with a common due date. Lecture Notes in Computer Science, 4693(3), 689-695. (SCI).
  52. K. C. Ying* and S. W. Lin (2007, Jul). Multi-heuristic desirability ant colony system heuristic for non-permutation flowshop scheduling problems. International Journal of Advanced Manufacturing Technology, 33(7-8), 793-802. (SCI). 本人為第一作者、通訊作者.
  53. S. W. Lin, S. Y. Chou* and K. C. Ying (2006, Mar). A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date. European Journal of Operational Research, 177(2), 1294-1301. (SCI).
  54. K. C. Ying* and S. W. Lin (2006, Aug). Multiprocessor task scheduling in multistage hybrid flow-shops an ant colony system approach. International Journal of Production Research, 44(16), 3161-3177. (SCI). 本人為第一作者、通訊作者.
  55. 黃乾怡*, 應國卿, 蔡欣倫 (2006, Sep).無鉛環保銲料鋼板印刷製程參數優化, 21(3), 227-235. (SCI).
  56. K. C. Ying and C. J. Liao* (2004, Apr). An ant colony system for permutation flow-shop sequencing. Computers and Operations Research, 31(5), 791-801. (SCI). 本人為第一作者.
  57. K. C. Ying* and C. J. Liao (2003, Jan). An ant colony system approach for scheduling problems. Production and planning control, 14(1), 68-75. (SCI). 本人為第一作者、通訊作者.
  58. K. C. Ying* and C. J. Liao (2000, Feb), A new whitening solution in grey relational space, The Journal of Grey System, 12(2), 327-330. (SCI) 本人為第一作者、通訊作者.
  59. K. C. Ying* and C. J. Liao (2000, Jan), Fourier modified non-equigap GM(1, 1), The Journal of Grey System, 12(1), 139-142. (SCI) 本人為第一作者、通訊作者.
  60. K. C. Ying*, C. J. Liao and Y. T. Hsu. (2000, Jan), Generalized admissible region of class ratio for GM(1, 1), The Journal of Grey System, 12(1), 153-156. (SCI) 本人為第一作者、通訊作者.
  61. 何敬之*, 吳水丕, 應國卿, 釋仁華 (1998). 坐禪對身心之效應, 華梵學報, 5(1), 1-15.
  62. 吳水丕*, 何敬之, 應國卿 (1998). 坐禪對於腦波的效應, 華梵學報, 5(1), 17-30.
  63. 吳水丕*, 應國卿, 何敬之 (1998). 坐禪對於反應能力之效應, 華梵學報, 5(1), 31-37.
  64. 應國卿*, 王繼成, 劉瑛展 (1997). 台灣家電業行銷通路衝突之研究, 華梵學報, 4(1), 81-90. 本人為第一作者、通訊作者.
  65. 應國卿*, 陳永昭 (1997). 作業研究在我國企業界應用現況之調查, 華梵學報, 4(1), 91-98. 本人為第一作者、通訊作者.


參與期刊編輯與審查


    A. 擔任期刊編輯

    1Far East Journal of Experimental and Theoretical Artificial Intelligence, Editor,  

               since November 2008~present.

    2Journal of the Chinese Institute of Industrial Engineers, Senior Editor, since

               February 2009~January 2012.

    B. 擔任期刊論文審查人

    1Referee for Applied Mathematics and Computation

    2Referee for Applied Soft Computing

    3Referee for Asian Journal of Industrial and Systems Engineering

    4Referee for Computers and Industrial Engineering

    5Referee for Computers and Operations Research

    6Referee for Engineering Optimization

    7Referee for European Journal of Operational Research

    8Referee for Far East Journal of Experimental and Theoretical Artificial Intelligence

    9Referee for IEEE Transactions on Automation Science and Engineering

    10Referee for Information Sciences

    11Referee for International Journal of Advanced Manufacturing Technology

    12Referee for International Journal of Computational Science and Engineering

    13Referee for International Journal of Electronic Business Management

    14Referee for International Journal of Engineering, Science and Technology

    15Referee for International Journal of Information and Management Sciences

    16Referee for International Journal of Precision Engineering and Manufacturing

    17Referee for International Journal of Production Economics

    18Referee for International Journal of Production Research

    19Referee for International Journal of System Science

    20Referee for Journal of Project Management

    21Referee for Journal of Scheduling

    22Referee for Journal of Technology

    23Referee for Journal of the Chinese Institute of Industrial Engineers

    24Referee for Journal of the Dynamics of Continuous, Discrete and Impulsive  

                 Systems Series B: Applications & Algorithm

    25Referee for Journal of the Operational Research Society

    26Referee for Journal of Quality

    27Referee for Mathematical Problems in Engineering