Results Published!!

758days since
Project Launch

Home

2013-2014
III-CSE Mini Project Report Format (29.03.2014)

NOC FOR III-CSE MINI PROJECT(Third Review-29.03.2014)
INTERNAL MARK CALCULATION FOR IV-CSE STUDENT (LAST DATE FOR GETTING SING -22.03.2014)
FORMAT   FOR  PREPARATION   OF   PROJECT  REPORT(IV-CSE)-13.3.2014 (3.00 pm) , Project report Size at maximum 80 pages (19.03.2014)
04.03.2014 (UG Project Review NOC,Circular, Instruction,Panel) 
25.02.2014 (UG-CSE REVISED PROJECT REVIEW SCHEDULE) 
20.02.2014 (PG-CSE(Mini Project Overall Review Schedule)
20.02.2014 (PG-MMT(Mini Project Overall Review Schedule
20.02.2014 (UG-Mini Project overall Review Schedule)
20.02.2014 (UG Project overall Review Schedule
20.02.2014 (PG Phase -II overall Review Schedule
19.02.2014 (IV-CSE-Second Review Work process) Must Handover this copy to your corresponding supervisor  
20.01.2014 (IV-CSE-First Review circular and PPT content)
20.01.2014 (IV-CSE-First Review Work process)
------------------------------------------------------------------------------------------
17.01.2014 (IV-CSE-First review ppt content are (Abstract,Introduction,Existing System,Drawback of Existing System,Proposed System, Advantages of Proposed System, Application, hardware and software specification,overall architecture of the project,List of module,module explanation with diagram,any one module implementation result, References,etc..) review date will be informed Later (Maybe (Jan End / Feb First week),11.25 AM  
---------------------------------------------------------------   
04.01.2014 IV-CSE (ONLY ONE BASE PAPER IS ENOUGH FOR ZEROTH REVIEW ),4.01 pm
04.01.2014 IV-CSE Supervisor List
04.01.2014 IV-CSE Change of Supervisor
31.12.2013 IV-CSE ZEROTH REVIEW PPT SAMPLE
 30.12.2013IV-CSE-PROJECT 0th Review (07-01-2014 to 08-01-2014),circular
30.12.2013IV-CSE-PROJECT 0th Review (07-01-2014 to 08-01-2014),schudule
IV-CSE-Project(2013-2014)-NOC Form
IV-CSE-Project(2013-2014)Batch Project-work  process-18.12.2013
Circular for Project Team – reg(IV-CSE),13.08.2013,9.30 AM
B.E- Final year Project Team Formation Data
Team Formation List ( Group /A/B/C),13.08.2013,9.30 AM

M.E & M.Tech zeroth review work process (2012– 2014)
PROJECT PHASE-2 VIVA VOCE FOR ME-CSE(10/07/2013)
FORMAT   FOR  PREPARATION   OF   PROJECT  REPORT(II - ME-CSE)-24.5.2013 (3.40 pm) , Project report Size at maximum 80 pages (last date of submission - 15.06.2013)
FORMAT   FOR  PREPARATION   OF   PROJECT  REPORT(IV-CSE)-21.4.2013 (3.40 pm) , Project report Size at maximum 80 pages (new)
Sample internal mark Calculation Formate for (IV-CSE-'A'&'B') ,21.04.2013 ,(2.45 PM)(new)
Sample PPT for Mini Project (III-CSE-'A' &'B'),(13.04.2013)10.40 am
Sample internal mark Calculation Formate for (IV-CSE-'A'&'B') ,13.04.2013 ,(9.45 am)
FORMAT   FOR  PREPARATION   OF   PROJECT  REPORT(IV-CSE)-12.4.2013 (12.45 pm) , Project report Size at maximum 80 pages
FORMAT   FOR  PREPARATION   OF   PROJECT  REPORT(IV-CSE)-10.4.2013 (4.45 pm)
IV-BE-CSE-'A'&'B' , III-CSE-'A'&'B' & M.Tech- multimedia - First & Second Review schedule (06.04.2013)
Phase II - First Review(15/02/13)
Welcome to the Project Tracking Workspace
 On this page you can view the Project Details, Titles, Project Members, Project Guide, Abstracts, Project schedules and other updates.
BE-IV Year First Review :1) A-Sec (Date :21.01.2013 ,                                                                 Time:9.00 AM to 4.15 PM,
No of Batch :1-15)
2) B-Sec (Date :22.01.2013 ,                                                               Time:9.00 AM to 4.15 PM,
No of Batch :1-15)
3) A &B-Sec (if any First Review Redo Batch )                                                                                                         (Date :23.01.2013 , Time:1.35 PM to 4.15 PM) BE-IV Year First Review circular(02.01.2013) BE-IV Year First Review NOC (02.01.2013) BE-IV Year First Review Work Process for Internal Project (02.01.2013) BE-IV Year First Review Work process for External Project (02.01.2013)
B.E Project Schedule(26.12.2012)
Comments