Home‎ > ‎A) Career History‎ > ‎

A.7) '07 - '08: Lockheed Martin

Requirements Manager, Merlin MCSP.

  • Naval helicopter capability-sustainment programme for the Royal Navy.
  • Responsible for ensuring that contracted requirements were met through the decomposition of user requirements into a detailed design expressed as a set of requirements that are correct, complete, testable and consistent with industry standards.
  • Member of Engineering Change Control Board and Commercial Change Control Board.
  • Focal point for Requirements Management centre-of-excellence.
  • Responsible for ensuring Requirements Management aspects of CMMI Level 4 were met.
Comments