With school places being at a premium and funding being drastically cut, a semi-permanent fast track solution was needed.
Two nursery classrooms were required quickly and had to meet the stringent regulations and quality expected by all.
A single storey, secure steel modular was the ideal product.
Limited space and a recently laid tarmac car park area was the location, with the emphasis being on not to damage the surface in any way as it would be re-claimed once the modular classroom is extracted.
Temporary foundations and the 6 steel sections were delivered, installed and weather sealed the same day ensuring the security aspect of the design was maintained.
The steel sided modular building shown installed, secure and painted to blend sympathetically with the adjacent building brickwork.
"never judge a book by its cover".
Factory manufacture allowed for the internals of the building to be already fitted prior to delivery to site. This method caters for greater quality of fit-out and significantly reduced the on-site works and lessens the day to day disruption of the school.
Multiple contractors worked in tandem to install IT equipment whilst final checks to the services connections were made and not long after this the school staff were loading in the seating and arranging wall decorations in readiness for the children.
This modular complex comprises of a double classroom configuration:-
Classroom 1
2 sections fitted with carpet tiles, non-slip vinyl, stainless steel sink and drainer c/w hot & cold water, store room and vision panel doors.
Entrance
2 centre sections with entrance lobby & coat hooks , 2 no. WC cubicles with hand wash sinks (childrens sized) and DDA WC.
Classroom 2
As per Classroom 1
This Modular Double Classroom, along with a Single Classroom are standard configurations and are ready to order without going through a lengthy design process.
Feel free to call us for a chat on how we can manage your project from start to finish and allow you to concentrate on your day-to-day responsibilities.