Crow Lane Landfill Documents

To open a document in Adobe Acrobat Reader, click the document title. (Some documents are large and may require several seconds to open.)
To save a document on your computer, right-click the document title and then click Save Target As on the menu that pops up.
 
 
DEP 72-Hour Notice (1/26/2010) Documents
 

Berm Boring Analyses and Berm Redesign Documents
 

Legal Opinion on Health Department Order Reopening Landfill

 

Landfill Operating Rules

 

Safety Data

Material Safety Data Sheet for Deodorizer Applied to Construction Debris
 
City Agreements and Orders Leading to 4/30/09 Reopening
 

Legal Documents Allowing Reopening - 4/30/2009

(Documents provided by DEP)

Appendix A to Crow Lane Settlement Agreement: Perimeter Berm Geotechnical Investigation Protocol

Appendix B to Crow Lane Settlement Agreement: Landfill Gas Control Protocol

Appendix C to Crow Lane Settlement Agreement: Landfill Cover Protocol

Appendix D to Crow Lane Settlement Agreement: Litter Control Plan

Appendix E to Crow Lane Settlement Agreement: Leachate Control Plan

Appendix F to Crow Lane Settlement Agreement: Interim Storm Water Control Plan

Appendix G to Crow Lane Settlement Agreement: Gypsum Removal Protocol

Appendix H to Crow Lane Settlement Agreement: Post-Cap 24/7 Landfill Monitoring Protocol

Appendix I to Crow Lane Settlement Agreement: Landfill Inspection and Record Keeping Protocol

 

Landfill Design Drawings and Specifications as of 2008

(Documents provided by DEP)
SITEC 3/7/08 Letter to DEP - Response to 11/19/07 DEP Comments on Corrective Action Design
SITEC 4/11/08 Letter to DEP -  Response to 3/25/08 DEP Comments on Corrective Action Design

Corrective Action Design - Construction Sequence Plan - SITEC Dwg CS-1 - Revised 4/23/08

Landfill Gas Treatment System Piping Diagram for Corrective Action Design - SITEC Dwg 1 - Revised 5/7/07

Existing Conditions and Collection System As-Built for Corrective Action Design - SITEC Dwg 2 - Revised 4/11/08

Final Grading and Stormwater Management Plan for Corrective Action Design - SITEC Dwg 3 - Revised 4/24/08

Landfill Gas Management Plan for Corrective Action Design - SITEC Dwg 4 - Revised 2/29/08

Gas Well Installation and Connection Plan for Corrective Action Design - Gas Extraction Wells EW-7, EW-10, EW-13 - SITEC Dwg 4A - Revised 10/1/07

Landfill Cross Sections and Perimeter Access Road/Berm Detail for Corrective Action Design - SITEC Dwg 5 - Revised 4/11/08

Final Closure System Details and Stormwater Management Details 1 for Corrective Action Design - SITEC Dwg 6 - Revised 4/11/08

Stormwater Management System Details 2 for Corrective Action Design - SITEC Dwg 7 - Revised 12/20/06

Landfill Gas Management System Details for Corrective Action Design - SITEC Dwg 8 - Revised 6/27/07

Leachate Collection System As-Built Details for Corrective Action Design - SITEC Dwg 9 - Revised 2/29/08

Final Capacity Plan for Corrective Action Design - SITEC Dwg 10 - Revised 4/16/08

Perimeter Berm Construction Stage 1 Preparation Plan for Corrective Action Design - SITEC Dwg 11- Revised 1/9/07 (Most text illegible)

Perimeter Berm Construction Stage 2 Preparation Plan for Corrective Action Design - SITEC Dwg 12- Revised 1/9/07 (Most text illegible)

Perimeter Berm Construction Stage 3 Preparation Plan for Corrective Action Design - SITEC Dwg 13 - Revised 5/9/07

Westerly Perimeter Berm Construction Sections and Profile for Corrective Action Design - SITEC Dwg 14 - Revised 4/11/08

Southerly Perimeter Berm Construction Sections and Profile for Corrective Action Design - SITEC Dwg 15 - Revised 4/11/08

Sample Construction Quality Assurance Record Keeping Forms (Appendix A to Corrective Action Design) and MSE Berm Quality Control/Quality Assurance Plan, Revised 4/10/08 (Appendix B to Corrective Action Design)

Corrective Action Design Technical Specifications for Perimeter Berm Construction, Final Closure Construction, Gas Extraction System Installation - Revised 4/24/08

Corrective Action Design Technical Specifications for Topsoil and Seed, HDPE Geomembrane, Geocomposite Gas Venting Layer

Corrective Action Design Technical Specifications for Geotextile Fabrics, HDPE Pipe and Fittings, Corrugated Polyethylene Pipe, Unreinforced Embankments and Mechanically Stabilized Earth Berm Construction

 
Daily Monitoring Reports
 
Complaint Summaries
 

Links to Additional Documentation

Crow Lane Landfill documents posted by Mass. DEP May 2006 to Sept 2007 and April 2009 to present: http://www.mass.gov/dep/about/region/crowlane.htm.

Crow Lane Landfill documents and photos on the Little River Basin Website: http://littleriverbasin.org/landfill.htm

Crow Lane Landfill chronology (timeline) on Little River Basin Website: http://littleriverbasin.org/CrowLaneLandfillChronology.htm
Aerial View with Affected Neighborhoods Outlined Approximately: http://sites.google.com/site/clldocs/index/affectedneighborhoods01.pdf