ROAD REPAIR CONTRACT 16-01

 

SUMMARY OF WORK AREA

 

Chip and Seal Work:

 

Street                                                                                              

Gregg Way – from Christian Valley Road to Allen

Allen Drive – from Christian Valley Road (North) to Stevens Drive

Mary Lane – from Thomas to the Ditch

 

The Chip/Seal Work needs to be swept within 5 days of application. 

The second sweeping for clean-up as directed within 60 days.

 

  

Ditch

Ditch work as directed by Lynn Cook on Walk Through

 

  

Patch

Patch as directed by Lynn Cook on Walk Through

(Clarification and direction during walk/drive through with Board member:

                                                                                            Lynn Cook (530) 878-2002)