ROAD REPAIR CONTRACT 17-01

 

SUMMARY OF WORK AREA

 

Chip and Seal Work:

 

Street                                                                                              

Mary Lane / Witt Road (as directed)

Otto Way

            Gayle Lane (from Stanley Drive to the pole – as directed)


 The Chip/Seal Work needs to be swept within 5 days of application.

The second sweeping for clean-up as directed within 60 days.



Ditch

Ditch work as directed by Lynn Cook on Walk Through

 

  

Patch

Patch as directed by Lynn Cook on Walk Through

(Clarification and direction during walk/drive through with Board member:

                                                                                            Lynn Cook (530) 878-2002)