CHRISTIAN VALLEY PARK COMMUNITY SERVICE DISTRICT (CVPCSD)

ROAD REPAIR CONTRACT 12-01

 

SUMMARY OF WORK AREA

 Street                                                                                              

                     Chip/Seal Work

Otto Way
Ray Circle (West Portion)
Kenneth Way (West Portion)

 The Chip/Seal Work needs to be swept within 5 days of application. 

The second sweeping for clean-up as directed within 60 days.
 

                     Ditch Work

Allen Drive

Gayle Lane

Lorin Court

Pondorex Road

Stanley Drive

Witt Road

Ditch work as directed by Lynn Cook

 

Patch

Allen Drive

Upland Drive

Thomas Drive

Barbara Court

Kenneth Way

 

Patch as directed by Lynn Cook

Shoulder Work

Gregg Way