1042days since
Summer Camp 2011

CBH Projects

If you are interested in working on a project on the list please contact the Council Office at 864-585-4391

Showing 6 items
ProjectLocationDescriptionMaterials NeededMaterials On HandTools NeededMan HoursStatusPriorityDate ScheduledUnit
Sort 
 
Sort 
 
Sort 
 
Sort 
 
Sort 
 
Sort 
 
Sort 
 
Sort 
 
Sort 
 
Sort 
 
Sort 
 
Check Scout Showers and Latrines Choctaw/Cheyenne/Catawba/Cherokee Stabilize step into shower, Hot water heater stack damaged?, Propane tanks -are tank controls secured from tampering  unknown No unknown Not Started   
Adust Screen Door Dining Hall Adjust the screen door in the kitchen so it closes tighter none No Screwdirver, sandpaper Not Started   
Replace/Repair Urinal Dining Hall Replace or Repair the urinal in the mens room in the dining hall Urinal No Screwdriver, pipe wrench, etc Not Started   
Make a campsite wheelchair accessible TBD Revamp one camp site or building with adequate facilities(wheelchair access) for handicapped Scouts. The Health Lodge is currently used with limited available space. wood, nails Yes saw, hammer Not Started   
Dinning Hall Light Bulbs Dinning Hall Replace light bulbs where needed light bulbs - wattage unknown No Ladder Not Started   
Bimetal Thermometer Dinning Hall Replace current Bimetal Thermometer Thermometer - need to purchase No screwdriver Not Started   
Showing 6 items
Č
Ċ
ď
Ken Reiter,
Nov 18, 2010, 8:06 PM