Tech Support: Decrease MailMerge Date Field

Decrease MailMerge Date Field

Good morning,
 
I am merging a "Year End" date field into a Word Document that is stored as January 31, February 28, etc.  I  need to make changes to the date in the document rather than in the source file.
 
I was having trouble that the year was defaulting to the current year 2013 and was thought I was able to correct that using SET DELAY -365.  
 
There is another field that needs to be the first day of the prior plan year.  So, January 1, 2012 for December 31, 2012 year ends.  Using SET DELAY -730 works well for the December year ends.   For other plan year ends, it goes all wonky:
 
Jan 31 year ends returns Jan 2 as the first (2011) and last (2012) day of the plan year.  Both should be 2012.
Feb 29 YE returns Jan 3
Mar 31 returns Jan 4
Oct 31 YE returns Jan 11
 
I believe the code I am using is from the "Calculate a day, date, month and year, using n days delay" section of DateCalc V2_85.doc by Macropod.
 
I think my problem is in needing to make some tweaks to the other SET fields (I did manage to remove the day).  I am not familiar with this coding and don't even know enough to be able to Google for help.  Can someone tell me what this language is called
and point me in the right direction to learn more about how it works and what the commands mean?
 
Thank you!

Anwsers to the Problem Decrease MailMerge Date Field

Download SmartPCFixer for Free Now

If you failed to fix it, another option is to call Microsoft and walk through the process with a technician. To do this, dial "1-800-936-5700". Explain the error that you received and the steps in the update process during which it was displayed. The technician will be able to walk through the steps from getting a new product key to finishing the installation.

Another Safe way to Fix the Problem: Decrease MailMerge Date Field:

How to Fix Decrease MailMerge Date Field with SmartPCFixer?

1. Click the button to download SmartPCFixer . Install it on your computer.  Open it, and it will scan your system. The errors will be shown in the list.

2. After the scan is finished, you can see the errors and problems which need to be repaired.

3. The Repair part is done, the speed of your computer will be much higher than before and the errors have been fixed. You can also use other functions in this software. Like dll downloading, windows updating and print spooler error repair.


Related: How to Update & Download NVidia GeForce 6100/nForce 420 WHQL Certified driver v.178.13,How to Update & Download NVidia GeForce 7600 GS Video Driver v.295.75 Certified,How Can I Update & Download NVidia GeForce 820M Driver v.344.48 WHQL,[Solved] Download NVidia GeForce GTX 560M VGA Driver v.296.17 Certified,Way to Update & Herunterladen NVidia GeForce GT 130M Video Treiber v.295.75 Certified,How to Update & Download SONY SVE14A1X1RH Realtek Ethernet Driver,Where to Download SONY SVS13A2W9ES Bluetooth Driver (Intel) v.2.6 - 2.6.23.40059,Best Way to Update & Download SONY VGN-CR203E Conexant HDAUDIO SoftV92 Data Fax Modem with SmartCP Setup Program v.7.62.0.50 driver,Best Way to Download SONY VGN-FE790G/N Wireless LAN Driver v.10.6.0.29,Method to Update & Download SONY VGN-NR31Z/S Firmware Extension Parser Device v.8.0.2.3,How to Fix Error 0x0000c1f5 Solución?,Error 0x80071a91 Win7 Fix Patch,Error 0x800ccc60 Windows Live Mail [Solved],Error Message 0x800ccc79 Outlook 2000 Fix,What is Error 0xc1ab0001?,[Answered] x64 saplugin dll,How to Fix Problem - Kb943729 Download?,Troubleshooting: Bccode D1 Error,Java Runtime Tech Support,Troubleshooting: ERROR NO SUCH GROUP Error
Read More: [Anwsered] Data not summed correctly by Excel,Dead screen after log in failure windows 8 [Anwsered],How to Fix Error - D.V.D. burner will not create a D.V.D. from \"Windows Movie Maker\" program?,Fast Solution to Problem: Date insertion on chart in Excel 2007,Troubleshoot:Deleting a Windows 7 back up file which is saying it is in use Error
Comments