> National Roads Inventory, as of 13 October 2023
> National Bridges Inventory , as of 13 October 2023
Notes:
lm - linear meters
Total Permanent Bridges comprises of Concrete and Steel
Total Permanent Bridges comprises of Bailey and Timber
Source: DPWH Central Office - RBIA
> Status of Irrigation Development, in Hectares , as of 31 December 2022
Notes:
a/ - Estimated Total Irrigable Area (ETIA) is based on the 3% slope criteria.
For Provinces with service area greater than the ETIA, it means that more area are now irrigated beyond the ETIA.
Total Permanent Bridges comprises of Bailey and Timber
Source: National Irrigation Administration (NIA)
> Mindanao Power Supply Gross Power Generation by Grid, by Plant
in Giga-Watt Hours (GWH)
Notes:
Generation data includes grid-connected, embedded, and off-grid generators.
BESS and Off-grid Generation separated from Grid Generation starting in 2021
Off-grid generation composed of NPC-SPUG and NPP generation
Gross Generation - the total amount of electric energy produced by generating units and measured at the generating terminal
BESS – Battery Energy Storage System
Source: DOE - Power Generation and Supply Development and Monitoring Section