BUILDING 88 - ELECTRICAL ACTIVITY

This event is to support the electrical work needed in Building 88.

PLANNED ELECTRICAL OUTAGE - TBD (January 22, 2022 POSTPONED)

AFFECTED BUILDINGS

  • 65, 65A, 65B, 88, and Blackberry Gate

TIMING

  • Saturday, January 22, 8:00 a.m. Utility power is shut off. Building tenants should put equipment in safe and stable mode before that time and on-site personnel exit the building.

  • Saturday, January 22, after 12:00 p.m. Buildings re-open as normal.

FOR BUILDING TENANTS

  • All building tenants are asked to place equipment in safe and stable mode by 6:00 a.m. on Saturday, January 22. Use this guidance from EHS to prepare your lab or technical area.

  • In consideration of the Lab's COVID-19 controls, if you need to be onsite to safely shut off your equipment, and/or set equipment to receive standby power, and/or restart equipment when power is restored, please arrange your site access with your respective Transition Leadership Team representative.

  • Standby power is available only to equipment that is already connected to e-outlets. Building 88 and Blackberry Gate will have standby power.

  • The buildings will not be occupiable during the power outage.

  • Entry to the Lab will not be impacted as Blackberry Gate will be equipped with backup power.

CONTACTS