Saddles on dollies and anchorage systems to facilitate loading, transportation and launching of 22’ diameter shielded TBM from one alignment to another
Client: Dragados/Judlau – East Side Access
Manufactured by: American Commercial
Struts with capacity for 50% of Full thrust for 22’ Diameter open TBM. Contingency plan for Y cavern re-launch
Client: Dragados/Judlau – East Side Access – CM009
Contingency plan for removing Double shield TBM through tunnel with ring beams. Includes custom engineered 240 ton capacity low profile dollies
Client: Dragados/Judlau – East Side Access – CM009
Complete plan with detailed design of all material handling components for removing 22’ diameter open TBM from tunnel
Client: Dragados/Judlau – East Side Access
Conceptual design of 4000 ton capacity TBM launching system
Client: Traylor/Skanska/Jay-Dee – Blue Plains
Detailed design of thrust ring for TBM launch systems
Client: Traylor/Skanska/Jay-Dee
Manufacturer: Traylor Brothers Evansville Shop
Preparation of detailed drawings for fabrication of 700,000 lb. structure which reacts 21,000 Kip TBM thrust
Client: DSI Underground
Manufacturer: DSI Underground
Conceptual design of TBM jacking frame
Client: Dragados/Schiavone
Preliminary design to determine budgetary cost for feasibility compared to other options
Client: SAK
Final design and drawings for TBM launch cradle and procedure
Client: Kiewit/Shea
Manufacturer: Nebraska Welding
Structure connected to bottom of gripper carrier allows TBM to back out through cross cuts
Client:
Dragados/Judlau – East Side Access
Manufacturer: American Commercial