Design of pipe carrier system with loader attachment and remote controlled dolly
Client: EBC
Manufacturer: Nebraska Welding
Conceptual design and budgetary pricing for system designed to transport and place tunnel liner pipe
Client: OHL
Complete carrier and placer system for 21,000 lb x 110” diameter x 40’ long pipes
Client: Michels/Jay Dee/Coluccio – Bay Tunnel
Pipe carrier for carrying and placing pipe sections 94.5” in diameter, weighing 20,000 lbs
Client: SAK
Manufacturer: Nebraska Welding, LTD
Carrier for pipes weighing up to 55,000 lbs
Client: SAK
Manufacturer: Nebraska Welding, LTD
Design and build system for moving pipe carrier in shaft without locomotive
Client: Aecon-McNally
Manufacturer: Nebraska Welding, LTD
Detailed Design and Supply of pipe carrier for 94” diameter pipe weighing up to 20,000 lbs
Client: SAK
Manufacturer: Nebraska Welding
Design of pipe puller arm enabling use on alternative pipe diameter
Client: SAK
Manufacturer: Nebraska Welding
Low profile transport system carries 2 x 104.5” OD x 50’ long x 42,000 pound steel pipes into tunnel. Runs on rail or remote steerable caster wheels. Includes fail safe rail grabbing emergency brake system.
Client: Traylor/Shea – San Vicente
Manufacturer: New Idea
Tandem carrier with disc brakes, pipe rotation drives, side shift and lift functions on all dollies
Client: Frontier Kemper/Shea – Seymour Capilano
Spreader beam picks pipe off of truck and rotates 90 degrees for installation for lowering down shaft. Then tips horizontal to place on hydraulic lift pedestals
Client: Frontier Kemper /Seymour Capilano
Conceptual Design and Budgetary estimate for pipe installation system in 12’ diameter tunnel
Client: Judlau
Conceptual design for complete pipe installation system including and carrier and placer
Client: Flat Iron Constructors
Joint Venture Project with Mining Equipment, Inc
Client: Michels Tunneling
Conceptual design of pipe handling system with pipe carrier and rail passer for 118” lined tunnel
Client: Aecon
Conceptual design and proposal for pipe carrier with capacity of 24,000 lbs., for installation in a 108” wide x 130” high horseshoe shaped tunnel
Client: Obayashi
Hydraulically driven roller system squeezes and drives pipe for lining existing tunnels
Client: Allied Pipeline Technologies
Manufacturer: Nebraska Welding
Hydraulically driven roller system squeezes and drives pipe for lining existing tunnels
Client: Allied Pipeline Technologies
Manufacturer: Nebraska Welding
Conceptual design and estimate for self propelled cart engineered to transport and install tunnel liner plates.
Client: Judlau
Conceptual design and estimate for pipe carrier on Rondout project
Client: Kiewit/Shea